Screen ICT providers
The assignment shall be based on reliable supporting documents.
APPLY
DOCUMENT
Decide to appoint a representative with comprehensible conditions
The test refers to the specific service, the unit that uses it and the function that is supported. Determine which documents are required for the performance, information security and subcontractors for this assignment.
The fitness test gains in significance when you follow a specific requirement up to the provider receipt. If a time-critical performance is performed, this can be a recovery report and the actual availability of an alternative way. Keep in mind which open information affects the decision or its conditions.
Prove the suitability for the commissioned performance
Compare performance profile and locations with the provider's evidence. Note their scope and date.
Check suitability for concrete use
Request relevant and sufficiently up-to-date evidence about organization, security processes, operation and continuity. Compare their factual and geographical scope with the service offered.
Testable supporting evidence A proven aptitude decision with identified gaps.
Clearing risks and conflicts of interest
Capture alternatives, concentration, replaceability and possible conflicts of interest in selection and evaluation. Name the requirements that must be met before signing.
Testable supporting evidence A decision-making risk assessment with conditions and responsibilities.
Recruiting and releasing open needs
Connect the documented decision with contract and registry maintenance. Keep later proof as temporary orders with responsible persons and resubmission.
Testable supporting evidence A released procurement stand or a reasoned postponement.
Secure the statement with a sample
Select the planned recovery location. The release note explains whether it is covered by the evidence and which edition follows from a gap.
The test certificate shall be valid for another place of operation
A provider will provide checks for its main data centre. The planned restoration will use another location. The bank will clarify the scope of the evidence and include the result in the release.
Released aptitude and risk file Careful checking and decision making are clearly associated with the ICT service actually commissioned.
- What you are examining
- Arrange main data centre and designated location for restoration to the sections of the review report. Capture report scope and date so that a missing proof can be clarified before the contract decision.
- What the post-test decides
- The release shall designate the location and open evidence. After a change in the performance levels, the same comparison for the current status is made again.
Templates and worksheets
The filler tool is directly under the task. Download the template for editing or open the Quick View.
Test sheet for the selection of an ICT provider
Compare the pre-test of service, ability, risks, replaceability and document access.
Outcome The selection decision can be understood by proven risk factors, alternatives and effective conditionality.
Read the instructions
Fictional example Two providers meet the SLA. One does not provide data on the sub-service for restarting. The lower cost provider cannot evaluate the replacement.
- Compare residual risk Evaluate the occurrence and impact of each scenario before and after the treatment, on the same internal scale.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Secure the missing information before release and check the instructed remedy and alternative.
Assign product records to ICT appointments
Procuring with product proof
Check product documents provided by the provider for the intended version. Determine the ICT service and the DORA-relevant scope of contract separately.
Checking evidence of procurement
Legal basis for this task
Compare the decision from the test example with the relevant rule.
Art. 28 para. 4 and 5 and Art. 29 DORA · Preliminary testing and concentration
Articles address, inter alia, due diligence, risk assessment, conflicts of interest and information security standards in the assignment.
For your exam Careful checking and decision making are clearly associated with the ICT service actually commissioned.
Check contract approval on the basis of the specific benefit
Check the scope of services, critical or important functions, contractual rights and open findings before release. For internal evaluation, assessments on EUGRC.AI are available.

