EU AI ACT · IMPLEMENTATION GUIDE

Application dates and legacy AI

Determine the date of application, transitional rule and the recorded delivery status according to the AI regulation.

ROLE
DEPLOYMENT
OVERSIGHT

Check application data on concrete use

The general application shall begin on 2 August 2026. Chapters I and II, GPAI requirements, the new prohibitions under Article 5 and the phased application of Chapter III shall be considered separately. Sections 1 to 3 of Chapter III shall apply in principle to Annex III to 2 December 2027 and to Annex I to 2 August 2028, each with the exception of Article 6(5) as provided for in Article 113.

For old stocks, you need proof of when exactly which version was placed on the market or put into operation. Check for high-risk systems the respective reference date, later significant changes in the design and, if necessary, public use according to Art. 111(2). Check the respective transitional rules for older GPAI models and the technical marking of older systems according to Art. 50(2).

Deriving the relevant date

  1. Checking the high risk age on the basis of design

    Confirm the validity of the transitional rule and compare the documented old state with the subsequent changes. Check the special rule for public use separately. Create a later change in the intended use and assess the impact on the documented concept.

    Testable evidence Dated legacy decision with version, change result and resubmission.

  2. Distinguishing GPAI and Labelling Transition

    Check the initial deployment per model or system and the respective transition date. Enter a GPAI model from July 2025 and a synthetic content generating system from July 2026. Compare both dates.

    Testable evidence Two separate data sets for model provider obligation and technical content marking.

  3. Make the appointment on the article and path

    Document the specific obligation and the date confirmed by article and attachment. Perform the transition evaluation separately. Calculate a preliminary for an Annex III deployment and an Appendix I product path separately.

    Testable evidence Timetable overview with source, system version and start of work.

The graph lists 2 August 2026, 2 December 2026, 2 December 2027 and 2 August 2028 and assigns them to the general application, selected transitions and high risk pathways
The graph lists 2 August 2026, 2 December 2026, 2 December 2027 and 2 August 2028 and assigns them to the general application, selected transitions and high risk pathways

Select the start date for the specific obligation. In case of already provided AI systems and GPAI models, you also check which transition according to Art. 111 applies to the respective version.

Replace a GPAI model

The old AI model for internal document assistance was first made available in the EU on 15 July 2025. For the successor, the provider confirms January 19, 2027. In the test, the new model refers in two out of eight tasks to documents that are blocked for the user role.

What you decide

Reason the relevant application date per model version and then decide separately on the release of document assistance.

Edit Case · Replace a GPAI Model

Templates and worksheets

Use the workbook for your own data and calculations. The fillable quick view contains a sample sample and a protocol for your own process.

  • Application data and transitions

    Calculate the calendar data per mandatory path. Support the system status, a new provision and the check of the old inventory separately.

    Outcome A time-limit sheet with date of application, advance date, confirmed deadline and open transitional decisions.

    Read the instructions

    Fictional example KI06 · The model provided in July 2025 and the model provided independently in January 2027 have different time references.

    1. The starting position Confirm mandatory path and role
    2. Editing the Process Provide and provide evidence
    3. Secure Decision Decide on the lead, resubmission and old stock

Official sources

First check for this task

Other official references3

What is the next decision?

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • Risk classification

    The prohibition, product-related high risk path, Annex III and transparency are independently assessed.

    Starting point Documented purpose, process observations, applicable plant position and tests to influence the decision.

    Work result A reasoned classification note with proven conditions, independent transparency check and clearance.

    View the guide
  • High risk · Providers

    Conform risk, test documentation, technical documentation and compliance at the same system level.

    Starting point Technical documentation, risk management file, data and test documents, operating instructions and confirmed compliance path.

    Work result A version dossier with comprehensible release or open blocking points and a transfer to the operator.

    View the guide