EU AI ACT · IMPLEMENTATION GUIDE

Evidence for technical AI changes

Track change, risk assessment, technical documentation and version proof.

ROLE
DEPLOYMENT
OVERSIGHT

Check technical evidence and changes to your own system

Freeze the status presented for decision with system, model, configuration and intended purpose. Check whether risk files, test results, protocol format and instructions mean the same combination. Check the scope and documented portability of accepted documents.

When updating, you distinguish between conformity effects and a modified purpose. For a further learning system, check whether the change and its effect were predetermined in the original conformity assessment and that they were part of the technical documentation. Take the decision with regard to Art. 3 No. 23, Art. 25 and Art. 43 para. 4.

Keeping the actual delivery version

  1. Confirm version status from original document

    Arrange test report and technical documentation of the specified delivery. Check each acceptance of old documents for reliable transferability.

    Testable evidence Unique version and test scope per document with reference to the original.

  2. Continue to change all relevant evidence

    Track a modified data path from the documented system and test for risk records and, if applicable, until market observation.

    Testable evidence Modified dossier elements with test bench, responsibility and mandatory repetition.

  3. Renewed conformity assessment decision

    Check materiality, purpose and with continuing learning systems the pre-determined changes including benefit.

    Testable evidence Version-related decision with location of the previously evaluated change or planned new procedure.

  4. Insert change and document lock into the release process

    Arrange the decision on deviation, repetition and release into the responsibility of quality management.

    Testable evidence Protected old test bench and authorized new release on four eyes in case.

Open procedures and additional checkpoints in the article register

A proof is still part of the old configuration

The fictitious system learning evaluation changes the pre-processing of table responses in version 2.7. The purpose is unchanged. Five proofs are mandatory in the test order for the release of 2.7. Four are clearly assigned to the new status.

Make a configuration change from risk to resilient version dossier.

What you decide

A version-sharp finding and a reasoned decision whether the conditions for a new conformity assessment are available.

Edit case · A proof is still part of the old configuration
Target version 2.7, 2.6. report test head A new cover sheet is not a new test.
Target version 2.7, 2.6. report test head A new cover sheet is not a new test.

The test bench documented in the original report is decisive.

Documenting your own test

A supporting index with status per proof, visible barriers and documented decision on a further conformity procedure.

  • Technical supporting matrix and modification test

    Check each required proof individually for version reference, document quality and transferability. An old proof can only be carried on with confirmed cover.

    Outcome A supporting index with status per proof, visible barriers and documented decision on a further conformity procedure.

    Read the instructions

    Fictional example KI13 · Four documents bear the delivery. The fifth report mentions the old preprocessing. A later dated cover page does not change the checked status.

    1. The starting position Set the order with a specific delivery identifier
    2. Editing the Process Match version, scope and portability
    3. Secure Decision Detach proof correction and conformity decision

Official sources

What is the next decision?

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • Conformity and market access

    If the status is technically proven, check procedures, declaration, identification and registration.

    Starting point The intended purpose, the position in Annex I or III and the conformity documentation prepared for this version.

    Work result A reasoned procedure with a reliable assessment, declaration, identification and registration, where appropriate.

    View the guide
  • Protocols and supervision

    If the configuration identifier is missing, test the traceability from a real decision log.

    Starting point A pseudonymous case identification, time base, observed work steps and a permissible retrieval path.

    Work result A reproducible decision track with comparison to the downstream action and a check of access limits.

    View the guide