CRA · CASE STUDY

A library is missing from the SBOM

One of nine direct dependencies is missing in the package reconciliation.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

The manufacturer of a measuring station compares the release package with the SBOM. The delivery file for the station and the remote process necessary for the evaluation contain a total of nine direct libraries.

The exported list contains eight entries. According to the package protocol, the missing data library is included in the remote process. The supplier provides a corrected file. The remote process must be compared with this version.

Compare test data and consequences

  • Direct dependencies

    Scale
    9 in the delivery manifest
    Observation
    8 in the SBOM
    Follow
    File open
  • Data library

    Scale
    Unique version in the remote process
    Observation
    Included in the package
    Follow
    Add entry and proof
  • Supplier correction

    Scale
    Confirmed on the delivery product
    Observation
    Changed Export Available
    Follow
    Repeat version match
Nine direct libraries in the package. Eight are included with correct version in the software piece list.
Nine direct libraries in the package. Eight are included with correct version in the software piece list.

The open position denotes a specific library. The balance of the number is only sufficient with confirmed version.

Edit the test step by step

  1. Secure the expected size

    From build and delivery manifest, find out nine direct libraries. Include the necessary remote process in the comparison.

    Testable evidence Full expectation with a clear product level.

  2. Match the parts list with the delivery package

    Compare component and version line by line. Capture the missing library with reference to the delivery manifest.

    Testable evidence Deviation, not a mere completeness rate.

  3. Document correction and negative test

    Read the corrected export machine and compare all nine libraries with the delivery level again.

    Testable evidence Correct and reproducible list of items for the delivered version.

Worked decision and negative test

Decision in case

The SBOM is incomplete. The manufacturer corrects the export and assigns the library to the remote process so that later indications can be checked against the actual inventory.

Only after the package comparison confirm that the correction shows the delivered product stand. Put export and origin manifest together.

Counter-sample and impact

Complete the ninth position with the library version from the test system. The number is correct, but the version balance keeps the position open until confirmation.

Templates and worksheets

  • Configuring components and SBOM

    Compare package manifest, machine readable SBOM and version of the component actually delivered.

    Outcome Version-related bit list with documented correction and repeated package comparison.

    Read the instructions

    Fictional example Nine direct dependencies are in the delivery package. The ninth library is missing and then supplemented with the test version.

    1. Identify the starting situation Record expected components from the delivery packages.
    2. Run the test Compare version, location and role of the component with the SBOM entry.
    3. Secure decision and evidence Close deviation with supplier change and rematching the package.

Official sources

What depends on your result?

  • Components, SBOM and suppliers

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Vulnerabilities and knowledge

    A specific note is available and must be assigned to the versions delivered.

    Identifying the time of knowledge