CRA product case studies
Edit 43 CRA cases to product limit, compliance, updates, market access and procurement.
CONFORMITY
MAINTENANCE
Choose the appropriate case after your test order
The 43 fictitious cases range from the first product order to procurement, operation and supervision. Choose the concrete decision that corresponds to your task. When changing a version, first check which status is actually provided.
Each case contains initial data, verifiable criteria, a reasoned model decision and a modified condition. When transferring to your product, replace the sample data with your own supporting documents.
Organize product and responsibility
First, clarify product scope, market role and deadline. The classification determines who needs which tests.
Without the remote process, the device cannot apply limit values
A well-founded product scope with associated software levels and responsibility for every necessary remote function.
Work through the caseSecurity update and new remote control have different consequences
A transitional note per batch and change with verified reporting path and evidenced reason for reassessment.
Work through the caseA password safe has only covered part of its requirements
A reasoned category and a documented procedural decision for the requirements not yet covered.
Work through the caseThe importer shall sell the same data logger under its own trademark
A role decision per sales model with assigned test, support and reporting assignment.
Work through the case
Release the specific delivery level
Match protection effect, parts list, test procedures and technical documentation to the same delivered version.
The secure profile is in the manual and missing in delivery condition
A product safety note with its own findings, targeted remedy and proof of actual delivery.
Work through the caseA direct library is missing in the list of items of the delivered product
Decreased list of components to the delivery level and documented handling of instructions.
Work through the caseThe delivery contains version 2.4 and the explanation mentions version 2.3
Before delivery of agreed clearance level or occupied lock with targeted remedy.
Work through the case
Organize product safety after delivery
Secure maintenance and update access. When observing, check promptly whether a mandatory message is triggered.
The plant runs for eight years and the component contract covers four
Reasoned support decision with jurisdiction, published disclosure and update availability plan.
Work through the caseA general note is used to confirm the use of:
A repeatable decision-making protocol with knowledge time, the appropriate reporting method and a secure remedy.
Work through the caseA product incident and a actively exploited vulnerability have different closing periods
The deadline and transmission track per branch with completed responsibilities and documented user information.
Work through the case
Product changes and version supply
You are planning to change the product already delivered. Check purpose, actual product effect and supply to previous users.
A pure display should trigger a position commands in the future
Compare old display and new automatic control. Decide which test is required for the new version.
Work through the caseAfter the change of operation warnings come too late at two locations
Check whether a new operator of the remote function ensures the promised warning and the agreed relapse.
Work through the caseThe new version is free, but 14 systems need an upgrade
Of 48 systems, 14 can only use the new version with a fee-based adjustment. Check the consequences for maintenance.
Work through the case
Component maintenance, updates and disclosure
You assume responsibility for third-party components. Support responsible care, secure updating and understandable user information.
The same library is published, maintained and offered as a product
Compare the contributions of a volunteer, the permanent care of a foundation and a commercial offer of the same library.
Work through the caseWhen replacing a library, two device variants remain unscathed
Track 46 device variants from the expiring component to the updated parts list and independent after-test.
Work through the caseThe appropriate update will be installed, an unsuitable one must be rejected
An update reaches all sample devices. A test device must reliably reject a package that is unsuitable for its setting.
Work through the caseThe correction is ready and the partner wants to keep silent
Compare publication after available correction with a justified delay. Check the mandatory reporting path independently.
Work through the case
Distribution and market surveillance
You check a delivery or answer a complaint. Determine the exact inventory, the correct documents and the proven correction success.
Two boxes contain a version other than those indicated in the dossier
Two devices in a batch have documented newer firmware than they are. Secure the decision of importers and distributors.
Work through the caseThe explanation is missing and product safety needs to be specifically checked
Edit a missing explanation and separate technical findings. Provide the proofs per requirement.
Work through the caseAfter the remedy, 20 distribution devices and 60 devices remain open to users
Of 800 affected devices, 720 are confirmed. Disconnect inventory, devices with users and the effort to close the gap.
Work through the case
CRA, AI Regulation, NIS2 and DORA
A product version or event affects several rules of law. Arrange supporting documents for the respective role, check or report.
Internal AI check does not cover the CRA procedure of the firewall
A firewall with independently classified high-risk AI requires a proven CRA procedure path and evidence for the AI requirements.
Work through the caseManufacturers, waterworks and banks know the same incident at different times
Three organizations use the same raw material. Determine their own reporting level and first mark for each role.
Work through the case
Test file, risk and follow-up
The delivery stand is specified. Check whether the original document covers exactly this version and if a follow-up test uses the same scale.
A cooling monitor has six test certificates and an open version cover
A delivery version, six tests and a report on the old situation. Arrange the documents so that third parties can understand the decision.
Work through the caseThe replacement warning reaches the workstation in the cooling hall too late
A warning must arrive in eight minutes. In the changed environment, the sample shows 18 minutes.
Work through the caseAll six tested devices pass and a depot missing in the sample
Six passed samples cover two delivery profiles. A third profile is missing completely.
Work through the caseNine successful post-tests use a too generous time limit
Nine successful samples are only valid for five minutes instead of three. Decide which repetition will close the result.
Work through the case
Serial release and storage
A production line, a standard or a type change. Determine which release continues and which documents you must hold.
The firmware is correct and two devices get the wrong start profile
For two devices of a new line, the delivery profile deviates. Determine the scope of the affected series.
Work through the caseA standard is run for nine requirements and covers only six
A fictitious standard appears in the dossier. Six requirements are met, three need their own evaluation.
Work through the caseThe internal report is correct, the certificate does not yet record the new status
A new component touches the approved type. Separate internal test results, approval and manufacturing conformity.
Work through the caseThe last security download remains available longer than the technical file
Different time references apply to a product. Calculate the relevant scheduled dates and test the actual call.
Work through the case
User information and product operation
Check the contact that is actually available, the status in the purchase channel and the effect of new information on a notification decision already taken.
15 users are missing a sustainable contact document before setting up
The authority is informed. 15 out of 160 users lack a documented information path.
Work through the caseTwo channels show the end of support and one shows the wrong status
Online shop and packaging are right. A sales channel shows the end of the previous model generation.
Work through the caseA near incident will later become a confirmed product safety incident
A manufacturer shall first receive a warning of an prevented failure and shall subsequently confirm a serious product safety incident.
Work through the case
Technical and joint evidence
Several rolls or rules refer to the same assembly. Determine the size per product and decision and share appropriate raw material.
Remote access is protected and a safety sample of the machine is missing
The remote access of a packaging machine is documented. The team still needs its own observation of the safe system function.
Work through the caseThe update path works and the independent recovery takes too long
Two service providers use the same update partner. The recovery takes 18 hours instead of the agreed eight hours.
Work through the caseThree offers use the same electronics and need three reasons
A medical device, a general network logger and a component intended for identical replacement only share one assembly.
Work through the case
Checking the protective effect on the specific product
Check return and secure re-recording, actual data path or sync after a controlled remote interruption.
A reset device remains connected to the old account
Twelve returned logger patterns start fresh. Two are still assigned to the previous account in the associated service.
Work through the caseOne meter sends too much data and logs too little
Out of 20 processed data fields, only seven are justified. Two out of four security-relevant changes are missing in the protocol.
Work through the caseEight out of 80 records are missing after reconnection
A commodity reader records 80 test operations offline. Only 72 of them reach the common stock when reconnecting.
Work through the case
Clearing the appropriate market access and proof of procurement
Direct the decision on the notified scope, actual offer, first market reference or documented procurement criteria.
A new test scope is missing in the quality system confirmation
A class II hypervisor receives a new location. Confirmation of its size is still pending.
Work through the caseA pre-production device can already be ordered in the webshop
A trade fair prototype is clearly marked. The shop version can be ordered regularly despite the same indication.
Work through the caseTwo delivery-free persons are on different sides of the deadline
Twelve Funkgateways were placed on the market on 8 December 2027. A second lot is to follow on 12 December.
Work through the caseThe promised support ends two years before the planned end of operation
An awarding agency needs seven years of care. A tender takes five years and leaves the connection supply open.
Work through the case