CRA · CASE STUDY

Fourteen installations need an upgrade

Of 48 systems, 14 can only use the new version with a fee-based adjustment.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A manufacturer provides a substantially modified version of its networked evaluation software and offers access free of charge. Existing customers use the older version in 48 systems within the specified support period.

The new version in 34 systems works in the current environment. In 14 systems, a fee-based upgrade of the operating environment is required for the change. The manufacturer has not agreed to a free alternative or an adapted version.

Compare test data and consequences

  • Access

    Scale
    Latest version free for previous users
    Observation
    Free download occupied
    Follow
    A requirement is met
  • User environment

    Scale
    Adjustment without additional costs
    Observation
    14 out of 48 require a paid upgrade
    Follow
    Limitation fails for this supply
  • Further updates

    Scale
    Keep available updates already made available
    Observation
    Old version remains in use
    Follow
    Check ongoing tasks separately

Cost and technical usability in the inventory

Of 48 systems, 34 can change without additional upgrade. 14 systems need a paid upgrade in case of upgrade.
Of 48 systems, 34 can change without additional upgrade. 14 systems need a paid upgrade in case of upgrade.

Choose the alternative based on achievable use and actual cost of adaptation.

Edit the test step by step

  1. Identifying the previous user environments from the inventory

    Arrange the 48 systems of the delivered software, valid configuration and ongoing maintenance.

    Testable evidence Proven inventory with matching user groups.

    Acceptance criterion
    Reconcile expected and observed records using the same identifier. Resolve missing, duplicate or unmatched records individually.
    Evidence
    Reconciliation sheet recording the identifier, expected and observed mapping, source and finding.
  2. Check access and conversion costs per group

    Test retrieval, installation and essential function. Check necessary additional costs of adaptation.

    Testable evidence 34 confirmed changes without additional costs and 14 verified deviations.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.
  3. Remedial and further tasks separate

    Capture where the requirements for limiting to the latest version are missing. Secure the further supply there and check the user information.

    Testable evidence Reasoned care decision with own appointment for the 14 open plants.

    Acceptance criterion
    The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
    Evidence
    Versioned mapping of item, source and approved version with any discrepancy recorded.

Worked decision and negative test

Decision in case

The requirements are not met for the planned general restriction in the sample. Free access does not solve the technical and economic obstacle in the 14 systems. Plan to continue supplying these users.

A later decision requires a proven way of use without additional adjustment costs for the affected users. Document the applicability of the exception and the tasks to be performed separately.

Counter-sample and impact

The manufacturer takes care of any necessary adjustment for the 14 plants. However, only 13 changes are possible in the sample sample. Check for the last plant whether there is a practical access. A cost proof alone does not cover the missing functional sample.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.

Templates and worksheets

  • Check version supply without additional costs

    Compare access, technical conversion and actual extra effort per user group.

    Outcome Reasoned care and conversion decision for each group concerned.

    Read the instructions

    Fictional example Out of 48 systems, 14 require a fee-based environment upgrade for the new software.

    1. Identify the starting situation Identify user groups with their actual legacy environment.
    2. Run the test Confirm separately the costs and observed usability of the current version.
    3. Secure decision and evidence Maintain and secure any archive information.

Official sources

What depends on your result?

  • Determine further supported software versions

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Support period and security updates

    Plan support end, availability of previous updates and user information for the decided version inventory.

    Check support and updates