CRA · CASE STUDY

Legacy device with new remote control

An old batch gets a patch, a second one gets a new remote control.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A manufacturer will provide a batch of building sensors on the Union market for the first time on 15 November 2027. A security update in January 2028 fixes a vulnerability. It does not change the intended use and other product functions in case.

A second January update is intended to allow remote control of devices for the first time. Product management confirms a new intended purpose. Another batch of the old model will be made available on the Union market for the first time in January 2028.

Compare test data and consequences

  • First batch

    Scale
    Market provision before 11 December 2027
    Observation
    15 November 2027
    Follow
    Check the stock product
  • Pure security update

    Scale
    Purpose and other effect unchanged
    Observation
    Only remedy in case evidenced
    Follow
    Transition remains relevant
  • Remote control and new batch

    Scale
    Own purpose or initial provision
    Observation
    Both confirmed in January 2028
    Follow
    Check General Path

Edit the test step by step

  1. Verify the date of the specific inventory

    Arrange each batch using actual market availability. Separate storage date and initial deployment.

    Testable evidence Assignment per batch and date.

  2. Compare the effect of the change

    After the update, check the intended purpose and influence on compliance with Annex I Part I. Support patch and new remote control separately.

    Testable evidence Reasoned amendment decision per version.

  3. Evaluate the reporting path separately

    If an incident or use is confirmed, record the trigger separately for the product you have captured. Place the possible old date in the same file.

    Testable evidence Reporting check with knowledge time and responsible manufacturer role.

Worked decision and negative test

Decision in case

The pure security update does not lead to any significant change in the assumed case. For the new remote control, the general path is checked because the purpose is changed. The January charge has to be assessed independently of its own initial provision.

The reporting obligation already in force is considered separately for all products covered and an old initial provision does not resolve this test.

Counter-sample and impact

Remove the original January batch and leave only the date of manufacture. The classification remains open until the actual date of placing on the market is established.

11 June 2026 for notification, 11 September 2026 for manufacturer notifications, 11 December 2027 for general application
11 June 2026 for notification, 11 September 2026 for manufacturer notifications, 11 December 2027 for general application

First, you must set the right date. In case of existing products, you also check the transitional rule.

Templates and worksheets

  • Date and product change

    Evaluate initial deployment and modification per product or batch. Perform reporting obligations separately.

    Outcome The deadline for the submission of a reasoned transition, own reporting and responsibility.

    Read the instructions

    Fictional example A security update and a new remote control affect the same old charge. A January charge is first on the market after the deadline.

    1. Identify the starting situation Enter market entry and change per batch with date and location.
    2. Run the test assess the purpose and requirement of the specific change.
    3. Secure decision and evidence The manufacturer shall carry out the reporting test at the approved trigger independent of the transition.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Application data and inventory products

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Reporting route and deadlines

    Document the confirmed trigger and actual message for a captured product.

    Check the reporting route and deadlines