Radio equipment across the CRA deadline
Apply the reference date separately to the two delivery items actually provided.
BATCH
EVIDENCE
Starting position and test order
A manufacturer will be placing twelve networked radio gateways on the EU market for the first time on 8 December 2027. In case of instruction, the devices will fall under the RED cyber requirements triggered by Delegated Regulation (EU) 2022/30. The delivery list, previous legal reference and related test report are documented and the lot will then be resold without significant change.
Another eight gateways were manufactured before, but not yet placed on the market. Their first EU market reference is planned for December 12, 2027. The manufacturer owns the same earlier RED cyber file. The documented reference of the new lot to the correct CRA process is missing.
Compare test data and consequences
Go before the deadline
- Scale
- 12 units with first EU market access at 8.12.2027
- Observation
- Evidence for initial delivery and RED-cyber files available
- Follow
- Secure previous proof
Lot from the reference date
- Scale
- 8 units with initial delivery on 12.12.2027
- Observation
- Previous reports, open CRA referral
- Follow
- Keeping market release open
Continuing tests
- Scale
- Radio requirements and CRA notification separately assessed
- Observation
- Own responsabilites provided
- Follow
- Keep separate supporting documents
The first purchase per delivery
Link each serial number to the first market reference. Evaluate the previous cyber requirements, the new CRA reference and the reporting obligation separately.
Edit the test step by step
Track units and reference date
Secure the first documented market reference per unit. Link it to version and documents. Record resale and subsequent changes separately.
Testable evidence Dated list with comprehensible first-time marketing.
- Acceptance criterion
- The item under review and the documents refer to the same approved version. Record obsolete evidence as a separate discrepancy.
- Evidence
- Versioned mapping of item, source and approved version with any discrepancy recorded.
Determine relevant evidence per time reference
Arrange the previous lot of the then RED-cyber test and the new lot to the required CRA-proof. Perform further relevant radio requirements and reporting obligation separately.
Testable evidence The classification note shall be made in accordance with the provisions of the undelivered, legislative and technical acts.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
Check common evidence for portability
Open the original raw reports. After actual coverage, clarify which observations support the CRA stand and where a proof is missing.
Testable evidence The decision to cover the new lot and the comprehensible inventory for the previous lot.
- Acceptance criterion
- A second reviewer can follow the statement to the original evidence and the version checked. Record the evidence identifier or file reference with the decision.
- Evidence
- Evidence list recording original source, version, documented mapping and owner.
Worked decision and negative test
Decision in case
For the twelve devices previously placed on the market, the manufacturer retains the relevant RED cyber file at its original market level. The CRA reporting obligation is assessed independently and the assessment must be re-examined if a substantial change occurs.
Market access for the eight new devices remains open until the relevant CRA procedure and the continuing requirements for the radio system are proven. An appropriate previous report can provide raw evidence. Its scope and range must be confirmed for the new test.
Counter-sample and impact
Use the same production date for both lots in October. The documented data of the first placing on the market will not change. Continue to check the proof of market availability for the second lot in December.
- Audit record
- Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.
Templates and worksheets
Radio equipment and market access per delivery
Capture the first placing on the market individually and justify the relevant file to radio system and CRA.
Outcome Comparable classification for unstocked, unbroken and separate reporting requirements.
Read the instructions
Fictional example The two gatewayless were first made available or planned for on 8 and 12 December 2027.
- Identify the starting situation Connect initial deployment with version and piece list.
- Run the test Check the RED and CRA requirements at time.
- Secure decision and evidence Determine the continuing radio requirements and notification separately.
Official sources
First check for this task
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Radio equipment directive
Confirm the classification as a radio system and the requirements relevant to the specific delivery status.
Radio equipment and earlier RED cyber requirements
Check the radio system, relevant requirements and start of application as amended.
Other official references2
- Repeal of Delegated Regulation (EU) 2022/30 (opens in new tab)
EUR-Lex · Delegierte Verordnung (EU) 2026/339
Read Article 1 on the effect from 11 December 2027 and the reference to market surveillance of radio equipment previously placed on the market.
- Application data and conditions (opens in new tab)
EU-Kommission · Umsetzungsfahrplan
Keep track of the date of application and any relevant transition.
What depends on your result?
CRA and radio equipment rights to assign time
Transfer the same test criteria to your own product and save the different starting data.
Ranking radio equipmentApplication data and inventory products
Clear first placing, distribution and subsequent change on the basis of the same time and version reference.
View the guideReporting route and deadlines
Document the actual trigger and the reporting path for the responsible manufacturer role.
Check the reporting route and deadlines

