Requirements for a password vault
A password manager only meets part of the applicable requirements with the existing evidence.
CONFORMITY
MAINTENANCE
Starting position and test order
A software house wants to distribute a separate password manager. The main function of the software is to store and manage access data. The team assigns it after documented comparison of the category in Annex III Class I.
The proposed procedure has a total of twelve requirements. Seven are documented with the basis and its practical application recognised on the date of the application. Five lack this coverage. The technical development file also contains drafts for future standards.
Compare test data and consequences
Core function
- Scale
- Check category on the basis of technical description
- Observation
- Access data management confirmed
- Follow
- Annex III Class I
Recognised cover
- Scale
- Match each applicable item
- Observation
- 7 out of 12 occupied
- Follow
- 5 positions open
Standard status
- Scale
- Confirming recognition and accurate reach
- Observation
- Additional design available
- Follow
- Further coverage unexplained
Edit the test step by step
The core function
Compare product description, usual use and relevant definition of the implementing right.
Testable evidence Reasoned category with verifiable source.
Matching requirements and evidence
Cross the twelve positions individually with the applicable version and actual coverage. Perform drafts and published basics separately.
Testable evidence Cover with five specific named gaps.
Confirming the Right Way of Procedure
Arrange the outstanding procedure for the open requirements and document who carries out the necessary evaluation.
Testable evidence Procedure release with scope and assessment evidence.
Worked decision and negative test
Decision in case
The password manager is an important product of Class I. An existing design does not assume conformity here. The five uncovered positions must be taken into account in the intended procedure.
For the open requirements, the manufacturer shall check the appropriate procedure in accordance with Article 32(2). The result shall specify the reason for the process and the documented scope and leave the release open until confirmed proof has been provided.
Counter-sample and impact
Complete a test report for two of the open positions without proof of a recognised basis. The technical evidence increases. Check separately whether this will change the required process path at all.
Templates and worksheets
Conformity and delivery clearance
Arrange product category, coverage and proof of process to the concretely tested and explained delivery level.
Outcome evidence of procedural and clearance decisions with identified gaps per requirement position.
Read the instructions
Fictional example Seven out of twelve positions are covered by the password manager. The remaining five remain to be documented in the chosen procedure.
- Identify the starting situation record core function and applicable requirements.
- Run the test Document the recognition and scope of the evidence and confirm the method of evaluation.
- Secure decision and evidence Compare the test stand with the explanation and give open scope for acceptance.
Official sources
First check for this task
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Technical description of important and critical product categories
Compare the actual main function with the technical description in the annex.
Standardisation on the Cyber Resilience Act
Follow the development of standards and check for release decision the official find site and the scope covered.
Other official references1
- First European standard to support the CRA (opens in new tab)
EU-Kommission · Veröffentlichung einer Norm
Distinguishing the publication of the standard from the publication of its reference in the Official Journal.
What depends on your result?
Product category and test procedures
Transfer the same test criteria to your own product and save the different starting data.
View the guideConformity, declaration and release
Connect the confirmed procedural decision with technical documentation, explanation and concrete delivery status.
View the guide

