DORA · LEGAL SOURCES

DORA article register

Find the relevant DORA article and follow it to practical checks and supporting evidence.

SOURCE
APPLICATION
EVIDENCE

Determine the relevant articles for your business task

Regulation (EU) 2022/2554 regulates digital operational resilience in the financial sector. The following entry points lead from the applicable legal framework to the appropriate work page.

First, select a legal entity and a single business task. For a related restoration service, check the documented function, contract reference and test receipt. Determine which part of the decision is covered by the basic act and what question you are looking up in the specific standard.

DORA · Article Register

Art. 9 · Verify protective mechanisms in operation

Obligation Information security and ICT operations

The article combines continuous monitoring with concrete protection areas. RTS 2024/1774 specifies the implementation.

Test points for basic article

Art. 9 Paragraph 1Obligation

Continuously monitor the security status

Define operational indicators, managers and escalations per protection mechanism. Include availability and data integrity.

Testable evidence
Monitoring plan, measured values and processed deviation.
Sample
Track an off-set protection component from monitoring to efficacy testing.

DORA-A09-001

Art. 9 Paragraphs 2–3Obligation

Risk-based dimensioning of protective measures

Determine measures from classification and threat. Check the four protection targets in peace, use and transfer.

Testable evidence
Control allocation per data flow with efficacy assessment.
Sample
Check a confidential data exchange for transmission protection and access restriction.

DORA-A09-002

Art. 9 Paragraph 4(a)Obligation

Implement Information Security Directive

Define applicable controls for releases, data and ICT assets based on their classification.

Testable evidence
Directive with specific control requirements and control protocol.
Sample
Compare a data classification with the actual protection rules.

DORA-A09-003

Art. 9 Article 4(b)Obligation

Secure network and infrastructure separation

Define safety zones and procedures for the isolation of relevant compounds. Support that affected components can be separated without unacceptable consequences.

Testable evidence
Zone model, released rules and controlled separation sample.
Sample
Verify a planned separation using shared operating and communication channels.

DORA-A09-004

Art. 9 Article 4(c)Obligation

Limit access to justified functions

Apply access restrictions to logical and physical access. Check the purpose, permission and withdrawal requested.

Testable evidence
Permission matrix, approval, expiry date and withdrawal certificate.
Sample
Compare the exit of a person with remaining accounts and physical accesses.

DORA-A09-005

Art. 9 Paragraph 4(d)Obligation

Prove authentication and key control

Select appropriate authentication and encryption. Define the life cycle of cryptographic keys, backup and response to compromise.

Testable evidence
Access concept, key register and logged change.
Sample
Check validity, responsibility and relapse plan for a critical certificate.

DORA-A09-006

Art. 9 Article 4(e)Obligation

Control changes

Capture, test, approve and verify changes with a comprehensible risk reference. Make emergency changes to a downstream review.

Testable evidence
Update file with test, relapse option and release.
Sample
Check a memory change to see how sharing and actual configuration are connected.

DORA-A09-007

Art. 9 Paragraph 4(f)Obligation

Control patches and updates by risk

Define evaluation, deadline, test and release. Highlight rejected or delayed updates with compensatory action and date.

Testable evidence
Update file with risk assessment, implementation and follow-up.
Sample
Track a known operational weakness from the input to the correction or accepted exception.

DORA-A09-008

Specific technical requirements

2024/1774 · Art. 2Technical test

Transfer security requirements to effective controls

Set the scope, responsibility, release, feedback and handling of exceptions. Measure the actual application using controlled documents.

Testable evidence
Versioned specifications, release matrix and example of a treated exception.
Sample
Track an exception to the competent authority and the documented resumption of the standard.

DORA-A09-009

2024/1774 · Art. 6Technical test

Choose encryption by classification and risk assessment

Define the protection requirement per data processing and application. Choose, use and review appropriate cryptographic measures and deal with justified deviations.

Testable evidence
Classification reference, cryptographic directive and approved exemption.
Sample
Check a transmission path and a resting fuse for the rule applied.

DORA-A09-010

2024/1774 · Art. 7Technical test

Control keys over the entire life cycle

Track generation, storage, backup, rotation, blocking, recovery and destruction of relevant keys. Document loss or compromise as your own reaction case.

Testable evidence
Key registers with responsible persons, incident rules and change of record.
Sample
Compare the status and next maturity of a critical certificate with the key actually used.

DORA-A09-011

2024/1774 · Art. 8Technical test

Prove operational procedures and separation of environments

Set requirements for operation, fault handling, documentation and separation of relevant environments. Secure testing and approval of operational exceptions.

Testable evidence
Operating instructions and minutes of an approved amendment or exemption.
Sample
Compare development, testing and production using actual roles and release paths.

DORA-A09-012

2024/1774 · Art. 9Technical test

Evaluate capacity and performance proactively

Measure actual utilization, define acceptable limit values and plan capacity measures before reaching critical limits.

Testable evidence
Trend, comprehensible needs assessment and approved action decision.
Sample
Check utilization and response time in the peak window against available reserve and planned expansion.

DORA-A09-013

2024/1774 · Art. 10Technical test

Connecting Vulnerability Information and Your Behaviour

Process relevant internal and external information and check it against actual versions and exposed assets.

Testable evidence
Review journal with source, version concerned, deadline and responsible body.
Sample
Check a relevant new hint based on the inventory version and the documented decision.

DORA-A09-014

2024/1774 · Art. 10Technical test

Control regular vulnerability checks and prioritization

Document coverage, frequency, causes of deviations and treatment of findings after criticality and relevance to effects.

Testable evidence
Monitoring plan, verifiable results and assessed open weaknesses.
Sample
Select an asset that is relevant for critical functions and check the planned and actual audit.

DORA-A09-015

2024/1774 · Art. 10Technical test

Check, distribute and track exceptions

Link release, rollout proof and success control. Decisions on deferral or non-implementation need a well-founded and sustained status.

Testable evidence
Patch file with version soll, verification and compensation.
Sample
Check the distribution to a reasoned sample, including an earlier exempted installation.

DORA-A09-016

2024/1774 · Art. 11Technical test

Secure data processing and secure system configuration

Determine protection requirements for creation, processing, storage, transmission and deletion from the classification. Reject secure configuration and required exceptions.

Testable evidence
Protection matrix, reference configuration and verification of the actual system.
Sample
Check selected fields of a production dataset against actual memory and deletion rules.

DORA-A09-017

2024/1774 · Art. 13Technical test

Match network zones, rules and logical separation

Check segmentation, administration interfaces, protection of connections and regularly checked connection rules based on criticality.

Testable evidence
Network overview and verifiable verified rule set.
Sample
Prove that between two differently classified networks only the approved dependency exists.

DORA-A09-019

2024/1774 · Art. 14Technical test

Test Confidential and Integrous Transmission

Arrange transfers and remove access to a binding protection rule. Check encryption and protection against unauthorized transmission.

Testable evidence
Data flow and proof of verified transmission.
Sample
Compare a received file with shared target, label and integrity evidence.

DORA-A09-021

2024/1774 · Art. 15Technical test

Leading ICT projects with security and release points

Define project roles, targets, risk assessment, reporting and approval points. Include affected areas and controls in relevant changes.

Testable evidence
Project file with requirements, risk decision and commissioning review.
Sample
Check a project for documented safety decision before a significant production process.

DORA-A09-022

2024/1774 · Art. 16Technical test

Release development, procurement and maintenance loadable

Determine security requirements, environments, data usage and testing for developed or procured systems according to the relevant scope.

Testable evidence
Requirement, test proof, controlled transition and documented release.
Sample
Compare security requirements of a procured application with the actual decrease in status.

DORA-A09-023

2024/1774 · Art. 16Technical test

Control test data and development access

Set protection rules for data and access in development and test environments, including justified exceptions.

Testable evidence
Data and access proof with an exception.
Sample
Compare the data content of a test copy with the permitted use and authorized storage.

DORA-A09-024

2024/1774 · Art. 18Technical test

Cover physical and environmental hazards per site

Delegate physical protection and environmental controls from the importance of the systems supplied. Arrange location responsibility, access and test rhythm.

Testable evidence
Location risk assessment, proof of access and documented functional verification of protective measures.
Sample
Check the coverage of a shared electricity or climate supply.

DORA-A09-026

2024/1774 · Art. 19Technical test

Integrate ICT security into relevant personnel events

Arrange current obligations, roles and exits to a security process that makes responsibilities and relevant access changes verifiable.

Testable evidence
Exemplary roll change with adapted permission and confirmed information.
Sample
Compare role change, training needs and actual limitation of old permission.

DORA-A09-027

2024/1774 · Art. 20Technical test

Manage unique identities and their status

Keep track of which person or service uses an identifier when and how the installation, modification and deletion have been authorized.

Testable evidence
Identity inventory with assignment and proof of a status change.
Sample
Check an administrative and a technical identity for comprehensible owners and use.

DORA-A09-028

2024/1774 · Art. 21Technical test

Implement minimal, temporary and verified accesses

Limit access to responsibility and need, control privileged rights and verify timely withdrawal.

Testable evidence
Certificate of eligibility with approval, lettreview, expiry date and withdrawal certificate.
Sample
Check if an access granted after the end of a practice has been removed.

DORA-A09-029

Questions from the practice of supervision

The answers explain the application in the context specified. Check the status and transferability to your facts on the basis of the linked reference.

Answers in the EBA Single Rulebook 1

Working aids for this Article

  • Certificate Change Test Sheet

    Plan the exchange and check actual chain, residual term and usage through dependent services.

    Outcome The change is removed with correct chain, validity, function and relapse option.

    Read the instructions

    Fictional example The new certificate is active on the primary service, a second end point reports only six days remaining. A side endpoint still presents the old certificate.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Correct the affected endpoint and repeat functional, residual runtime and chain sample separately.
  • Capacity planning sheet

    Measure capacity reserves and thresholds under representative peak and replacement loads.

    Outcome Decision on the released load including bottleneck, early warning threshold and follow-up.

    Read the instructions

    Fictional example In a peak phase, the application processes 780 operations per minute. On the replacement path there are 610. 610 operations on the replacement path remain under the approved requirement.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Determine the bottleneck and repeat the load test with unchanged profile after adjustment.
  • Findings and treatment decision for a safety update

    Follow safety findings, maintenance-related deviation and correction until proven follow-up.

    Outcome A reasoned patch or exception decision with a clear deadline and dependence.

    Read the instructions

    Fictional example A supplier patch cannot be recorded during billing. Replacement control is running for a limited time. The test is done, but the operating data shows an old version.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Open the result again and secure version, risk decision and test on the same initial identifier.
  • Sample sheet for temporary authorisations

    Check application, effective privilege and timely withdrawal on a version-bound case.

    Outcome The rights sample combines approval, technical termination and evaluation of completed meetings.

    Read the instructions

    Fictional example A maintenance account receives temporary increased rights until 16:00. A follow-up test around 16:15 uses the same identity. Access is still possible after the expiration of another group.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Also withdraw indirect access and document a re-examination of both paths.
  • DORA test file for a memory change

    Before changing memory, set the initial level and the same criteria for first and second tests.

    Outcome Acceptance file with reproducible time value, alarm and decision to change.

    Read the instructions

    Fictional example The first run allows access after 85 minutes, but the expected alarm is missing. 85 minutes alone do not prove successful technical and professional acceptance.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Document two separate results and test the alarm delivery after correction with the same conditions.
  • Overview of the ICT risk framework

    Arrange guidelines, controls, independent audit and reports to the same framework.

    Outcome A versioned framework documentation combines risk target, implemented control and periodic efficacy test.

    Read the instructions

    Fictional example The management approves a new risk cap for ICT operations. The test program continues to refer to the old target version.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Determine the effective status, correct the reference and prove the application of the new limit in the plant.
  • Support index for repeatable test

    Create a repeatable index that holds together target criterion, sample, source and responsible rating.

    Outcome A second person may re-examine the examination without additional knowledge using the same referenced files.

    Read the instructions

    Fictional example A test protocol refers to a log extract whose file name remained unchanged after filing while the version was updated. The log proof shows the status instead of during the checked time window.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Secure the original version and keep the results up to approved release.
  • Comparison of function and ICT stock

    Control the actual functional and system reference against inventory and department.

    Outcome Missing or duplicate relationships are listed as concrete findings with system evidence.

    Read the instructions

    Fictional example The payment service is based on the application PAY-A and the key service KEY-07. KEY-07 is missing after a technical migration from the target inventory.

    1. Is to compare and Insert independent target and actual lists as text. Declare missing, duplicated and additional identifiers.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Clarification and responsibility from the system change take over and after correction compare both inventory levels.
  • Alarm delivery test protocol

    Check alarm, transmission route and processing with specifically triggered test signals.

    Outcome The time and delivery sample shows alarm cause, receiver, escalation and proven fix.

    Read the instructions

    Fictional example During a controlled test, a memory error creates an event. The primary channel is silent unplanned. In the event system there is an alarm, with the receiver no confirmation is available.

    1. Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Follow delivery and escalation after correction with unchanged test signal and independent time source.
  • Decision on ICT risk

    Calculate inherent and remaining internal risk values and document the authorised treatment.

    Outcome Risk decision with assumptions, residual risk limit, effective measure and resubmission.

    Read the instructions

    Fictional example A central service has no alternative entry 4 and impact 5. With tested replacement the entrance drops to 2. For impact 5, the reliable expert evaluation is missing.

    1. Compare residual risk Evaluate the occurrence and impact of each scenario before and after the treatment, on the same internal scale.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Keep the findings open, check the extent and dependence and release the assumptions by the competent authority.
  • Worksheet for a risk-based test programme

    Determine samples from the risk and determine the scheduled date, additional test and supporting documents required for acceptance.

    Outcome A risk-based test plan shall contain fully verifiable test items, dates, findings and follow-up tests.

    Read the instructions

    Fictional example The regular program tests the payment input and output. After an infrastructure change, an additional restart test is required. The memory change does not have a scheduled restart test.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Set an event-related test and secure release, results and deviations after completion.
  • Workbook for findings and follow-up tests

    Control remedial, retest, residual deviation and completion per unique finding.

    Outcome Final findings have a comprehensible follow-up test under the same relevant criterion.

    Read the instructions

    Fictional example In the first test, an event is not escalated. The second test only confirms internal logging. The result was closed before confirmation of alarm delivery.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Open the test and re-examine the observed result for the same criterion.
  • Planning sheet for check dates and change announcements

    Connect the rule date and event trigger to the same responsibility and check failed execution.

    Outcome A list of events leads from the occasion to test reports and independent monitoring of the effect.

    Read the instructions

    Fictional example The annual plan includes a restore test, an infrastructure change shifts the risk level earlier. The annual test is still considered to be up-to-date, although the platform has changed.

    1. Tax payable by Capture maturity and actual completion. Confirm the effect and follow overdue post-tests.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Capture the additional test regardless of the year and track the due date until the documented completion.
  • Roll balancing for release and independent control

    Adjust decision, implementation and independent control based on roles and actual access routes.

    Outcome A role sample shows who performs a concrete change, releases it and independently assesses it.

    Read the instructions

    Fictional example The operator can prepare a change. His representation has identical system permissions. In the sample, the same person confirmed implementation and independent verification.

    1. Evidence of decision Capture observation, scope and evidence per test step. Clear each open result before release.
    2. Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
    3. Treatment of deviation Unbundle the roles and repeat the permission and clearance test with personal representation.
Other official references3

Editorial update 2026-11-28 · Geltende Fassung und Zuständigkeit anhand der amtlichen Fundstelle prüfen.

Find the provisions relevant to your task

Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.

Who's on the map?

Start with the legally proven status. In a second step, clarify the risk framework and other obligations.

How is the frame supported?

Use a business performance as a sample. The framework must be comprehensible up to the valid procedure and the responsible role.

When will a malfunction become a report case?

Document observation, classification and dispatch based on their own time records.

How is the effectiveness tested?

Link test scope, applicable requirements and verifiable remedy.

What follows from the reference of an ICT service?

Use the specific performance as a starting point. In addition, check the meaning of the supported function.

Understand the rule in your own case

Select a legal entity, function and task. Determine relevant articles, responsible role and practical proof in one line.

Test criterion Another person can find the request and the accompanying document on the basis of your note.

Official sources

First check for this task

Other official references3

What is the next decision?

Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.

DORA Register

The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.

Determine the DORA treatment for a legal entity

Registration or registration certificate, actual performance description, organizational chart and list of participations.

Arrange the legal person and his actual activity. A note per legal entity combines authorisation or registration, possible exceptions, the applicable risk framework and the competent authority.

Work result The validity mark with the category checked, status certificate, framework and trigger of re-examination.

Your result Decision-making endorsement with source of authorisation, activity, result, open points and link to the information register.