Prepare resilience testing

To align tests with risks and business functions.

TEST PLAN
FINDING
RETEST

How do you detect effective resilience tests?

A test program documents which functions and ICT systems are being tested, which risks drive the selection and which evidence proves a successful test. Independence, responsibility and reporting procedures are clear before implementation.

Start with a known business dependency and describe the effect of the concrete sample. Arrange the test method, the role involved and the technical target to be assigned to the same test order. This also means that a later follow-up test is aligned with the original question.

If the post-test fails, the measure is corrected and the same test repeated. If successful, the release is verifiable.
If the post-test fails, the measure is corrected and the same test repeated. If successful, the release is verifiable.

Audit trail from the test order to the documented acceptance.

Connect test program and post-test

Use functional inventory, risk assessment, test plan and finding list from the same period of time.

  1. Set Test Subject

    Select function, scenario, scope and relevant dependencies according to risk. Set supporting documents and exclusion criteria in the test order.

  2. Separate test program and special requirements

    Check whether a threat-led penetration testing (TLPT) is planned for the Company. Plan supervisory contact, clearances, roles and evidence according to the relevant requirements.

  3. Confirming Correction

    Each finding has a cause, a competent body, a due date and a concrete validity criterion for the post-test.

Secure the statement with a sample

From an unfulfilled criterion, trace the result until the confirmed fix. The result is the repeated test and its release.

TEST PLAY

Example of a failed restart

A backup was technically readable. Only the technical test shows that performance data is missing. The subsequent test checks the completeness of the data on the same scale.

Test file with proof of correction The audit mandate, the result, the deviation, the follow-up and the final decision shall be taken together.

What you are examining
Count the expected performance data based on a secured reference. Compare keys, quantities and time with backup. The technical readability and the professional data comparison are given separate test results.
What the post-test decides
Repeat the professional comparison after follow-up. The specialist confirms on the same date that the expected performance data is available. Only then can the result be entered into the release.
Blog 299 – Welche Widerstandsfähigkeit ein Test zeigen muss.webp

From the blog

What resistance a test must show

Read how to test the tolerable interruption of a business performance as a benchmark for re-starting.

Read Post

Tasks in this thematic area

Select the work page for your role, next check point or corresponding proof.

Planning Risk-Based Test Program

Determine a test program from critical functions, failure scenarios and open findings and prove its coverage. Test gaps and priorities are documented by risk.

Deriving appropriate ICT system tests from function and risk

A system test checks a certain risk for a business performance. Before performing it, determine which system version and what operating condition are representative and from which evidence the effect is evident.

Your result Released system test with documented coverage of technical and technical criteria.

List threat-oriented tests

Clear the validity of threat-oriented tests, the role of supervision and the necessary clearances before a test.

Control threat-oriented tests and complete findings

This page deals with the responsible management of a threat-oriented test (TLPT) accompanied by an official. The focus is on mandates, business boundaries, evidence and return to risk frameworks.

Your result A agreed scope, audited decisions on changes and a comprehensible final act.

Fix and test test results

Follow a failed test criterion until the correction, retest and documented final decision. Check a correction to the original criterion.

Practice examination decisions in the case

Edit the initial data and compare your result with the well-founded solution.

Case D12

Follow up to the effective remedy

The revision examines a control in the fictitious port bank for the release of changes. The documented rule is complete. Proof of recurring execution has a gap.

Your result Final assessment with original target criterion, observed effect, audited version and reasoned decision.

Legal basis for this task

Compare the decision from the test example with the relevant rule.

  • Articles 24 to 27 DORA and Delegated Regulation (EU) 2025/1190

    The technical standard shall apply to the supervision, selection, roles and completion of a threat-oriented test.

    For your exam The audit mandate, the result, the deviation, the follow-up and the final decision shall be taken together.

Linking controls and tests in the annual plan

Plan and link events for controls, inventory checks and resilience tests with responsible persons and evidence. The assessments on EUGRC.AI are available for internal evaluation.