Technical rules for the ICT framework
Connecting rules with procedures and control records.
APPLICATION
EVIDENCE
The technical rules refer to an inspection in the enterprise
Delegated Regulation (EU) 2024/1774 sets out the implementation of ICT risk management. Title II deals with the general framework, and Title III the simplified framework.
Start with a business performance concerned and the framework assigned to it. Follow a specification, for example about the inventory, to a concrete operational procedure. The supporting chain is intended to show how an responsible and observable control step becomes from the source.
Find the provisions relevant to your task
Select the task to be solved. The location and the practical audit trail lead each to the appropriate destination.
Stock and responsibility
Link the approved functional reference to the system actually operated and its responsibility.
From the operating procedure to the established status
A released process is checked on the basis of a performed process. Choose both a normal case and a justified exception.
Correctly assign simplified requirements
Use separate references for the applicability and operational rules for documented risks.
Understand the rule in your own case
Select a technical check. Describe how the location leads to the operating rule and the actual observed result.
Test criterion The evidence explains when the check was carried out, at what level it was working and who decides to make deviations.
Official sources
First check for this task
ICT risk management · (EU) 2024/1774 · Art. 4 · Inventory
This article is a concrete example of the management of ICT assets and their life cycle.
For your exam Run the sample from business performance to asset.
ICT risk management · (EU) 2024/1774 · Art. 8–12 · ICT operations
The section covers operation, capacity, updates, system protection and logging.
For your exam Check the procedures used for a specific change.
ICT risk management · (EU) 2024/1774 · Art. 28 · Simplified framework
Title III gives concrete guidance and organisation for the companies under Art. 16 DORA.
For your exam First check the company status.
Other official references1
- Delegated Regulation (EU) 2024/1774 · Total standard (opens in new tab)
EUR-Lex · Amtliche Fundstelle
Technical rules for the general and simplified framework.
For your exam Check the title matching the legal entity.
What is the next decision?
Deepen the concrete work path with a sample. In the DORA legal register you will find the neighbouring sources if the decision touches another standard.
DORA Register
The source path leads from validity and risk framework to reporting procedures, information registers and resilience tests. For each reference point you will find out what it is needed for.
Linking information and ICT assets in the inventory
Functional inventory, technical inventory list, approved change order and service position of the service provider.
A verifiable inventory shows which information, systems and related services carry a named function. It remains understandable even after migrations, if identity, performance and actual version are maintained together.
Work result Versioned inventory reference with confirmed dependence on function and comprehensible change time.
Your result Updated inventory line with ordered service, system status and department release.

