Keys and certificates
The life cycle at the operation.
EVIDENCE
SAMPLE
Review renewal and representation at the actual key lifecycle
Evaluate the protection of information based on its classification and ICT risk assessment. The key file shows who releases generation, transfer, renewal and revocation within the respective procedure.
Select a maintenance window and track the process from the documented expiry date to the professional use of the renewed certificate. Before you specify who can perform, confirm and withdraw the change. You can then record testable identifiers and status details of the old and new status.
Work steps and verifiable documents
Connecting protection needs and method
Determine the data stock, processing environment and type of key. Set policy, control and jurisdiction for exceptions.
Testable supporting evidence Key evidence of control on the protected dataset.
Plan life cycle and representation
Merge the renewal date, expected expiry date and confirmed replacement role. Check how the process is triggered in case of representation and the change is released.
Testable supporting evidence Fixed change with rolls, test and relapse decision.
Old and new condition
In a re-examination test, document the successor used, the usability of the service and the treatment of the old key. Keep only suitable test metadata.
Testable supporting evidence Test protocol with identification and status of both versions.
Decision in the test example
The fictitious port bank discovers in the quarterly review a soon-to-run certificate of the payment service. The responsible person is absent during the maintenance window.
- Compilation of documents
- Place the release time and expiry date side by side. Confirm the new version on the actually used service and determine which proof is provided by the successful professional connection setup.
- Keeping a decision
- The representative takes over the documented role. The expert examination confirms the service with the renewed certificate. The process records the life cycle of the replaced certificate separately.
- Complete the test file
- Released certificate change, which demonstrates the operational capability of the new stand before expiry.
- Sample and acceptance
- Compare the expected expiry date with the actual change date. Check whether the representation and the technical acceptance are documented in advance.
The change of certificate ends with the technical acceptance
Combine renewal and professional sample. This allows technical changes and actually usable service to be confirmed separately.
Templates and worksheets
The filler tool is directly under the task. Download the template for editing or open the Quick View.
Certificate Change Test Sheet
Plan the exchange and check actual chain, residual term and usage through dependent services.
Outcome The change is removed with correct chain, validity, function and relapse option.
Read the instructions
Fictional example The new certificate is active on the primary service, a second end point reports only six days remaining. A side endpoint still presents the old certificate.
- Evaluate measurement Enter the same unit for target and is. Set the direction of assessment and complete the professional sample.
- Linking Evidence For relevant checkpoints, deposit the specific source, the verified version and the proof ID.
- Treatment of deviation Correct the affected endpoint and repeat functional, residual runtime and chain sample separately.
Legal basis for this task
ICT risk management · (EU) 2024/1774 · Art. 6 · Encryption and cryptographic controls
The requirements shall be applied to classification and risk assessment by cryptographic controls.
For your exam Support the selection of the data set concerned.
ICT risk management · (EU) 2024/1774 · Art. 7 · Key life cycle
The rules cover the life cycle and timely renewal of cryptographic certificates.
For your exam Follow the change to a representative service.
What is the next decision?
Select another service with planned renewal. Document in the proof file how its professional function is observed after the change and the role of representation is documented.
ICT operation and protection
Arrange applications, data and external services of a business function. Then select a specific sample, such as a controlled memory change or the withdrawal of an authorisation.
Your result Inventory status with technical reference and documented control test.
Detection dossier
Test job, original sample, version reference, correction and documented retest.
Link target criterion, drawn sample, findings and retest. The memory example shows which protocols prove the effectiveness of alarming to the checked status.
Work result A dossier in which a third party monitors expectations, observations, findings and conclusions per test criterion.
Your result A dossier from which another person can repeat the same sample.

