EU AI ACT · CASE STUDY

One incident, four reporting paths

Reconstruct four reporting tracks and check permissible time limits.

ROLE
DEPLOYMENT
OVERSIGHT

Starting position and test order

A fictitious malfunction on September 14, 2028 affects bank, independent IT service and a delivered product with digital elements. In the case of a serious ICT incident after DORA, a significant security incident for the NIS2 service and an actively exploited vulnerability in the CRA product are confirmed professionally. All time data are UTC.

The bank knows the 08.00 fault and classifies it around 10.15. The IT service knows the relevance of 09.10. The CRA manufacturer determines the actively exploited vulnerability around 10.00. For the high-risk AI system, the exercise confirms an independent serious incident according to Art. 3 no. 49 letter c. Significant knowledge is documented around 11.25. Around 11.45 the system provider determines the sufficient probability of the connection.

TrackTrigger on September 14The selected path's compute mark
DORA · Bank08.00 Knowledge, 10.15 Classification14 September 14.15
NIS2 · Service09.10 Knowledge of the relevanceSeptember 15 09.10
CRA · Manufacturer10.00 Knowledge of usageSeptember 15 10.00
AI Regulation · Provider11.25 Knowledge, 11.45 context29 September 11.25 as a standard practice calculation mark

Prepare the decision

  1. Match time and jurisdiction

    Secure the four triggers. Calculate in the normal DORA case classification plus four hours and knowledge plus 24 hours and check the previous mark. Use for NIS2 and CRA the knowledge confirmed per role.

    Testable evidence Three independently derived first registration marks and two separate 72-hour stamps.

  2. Check AI-reporting and shipping documents separately

    Document the direct reporting reaction after establishing the connection. Capture operator transfer, shipping and achievable recipients. Keep possible special paths explicitly open.

    Testable evidence Reporting track with original documents and documented decision on immediacy and case group.

What the test results

Situation A fictitious operating disruption on September 14, 2028 concerns Bank, independent IT service and a product with digital elements delivered.

Model decision and justification

The DORA first-time notification is to be considered in the assumed default case until 14.15 of the same day. The first-time marks for NIS2 and CRA are to be viewed on the following day. The AI track applies immediately after established connection. The 15-day mark shown is a computational maximum mark in the assumed case.

Counter-sample and impact

Move the DORA classification to September 15 by 10.15. The standard formula may not now be used to issue any alleged breach of duty under the same rule. Check the special case according to Art. 5(2) of Delegated Regulation (EU) 2025/301.

DORA at 8 o'clock with 10.15 classification, NIS2 at 9.10 o'clock, CRA at 10 o'clock, AI at 11.25 associated 11.45 clock.
DORA at 8 o'clock with 10.15 classification, NIS2 at 9.10 o'clock, CRA at 10 o'clock, AI at 11.25 associated 11.45 clock.

The timeline shows the exercise case of 14 September 2028 in UTC. DORA and the EU AI Act each have two established times. Determine the decisive trigger for each deadline separately.

Bank to competent supervisory authorities, IT service to competent reporting body, manufacturer via reporting platform and AI system provider to market surveillance in case.
Bank to competent supervisory authorities, IT service to competent reporting body, manufacturer via reporting platform and AI system provider to market surveillance in case.

The transmission documents remain associated with the respective entity and confirmed triggers.

Repeat with your own data

A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.

  • Four separate time-base tracks

    Arrange filled-in UTC fields to the confirmed legal and case path. Compare shipping and calculated computed marks with original documents.

    Outcome A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.

    Read the instructions

    Fictional example KI23 · DORA starts with 08.00 and 10.15. NIS2 uses 09.10, CRA 10.00 and the AI track 11.25 with additional connection detection.

    1. The starting position Keep chronology and relevant triggers
    2. Editing the Process Special case, immediate reaction and calculation mark separately check
    3. Secure Decision Submission by competent authority

Official sources

First check for this task

Other official references1

What is the next decision?

First, take the decisive observation from the case. Then, based on your open question, choose whether you want to check your own process or play a comparable case.

  • Separate reporting tracks

    An event concerns several entities, services or products and may trigger separate reporting obligations.

    Transfer method and result to your own use.

    Work result They carry out a common chronology with their own trigger, receiver and transmission receipt per obligation. Thus the parties can prove each deadline and notification individually.

    View the guide
  • Case studies

    You want to practice with fictitious data first or understand a similar decision from another role.

    Compare how another decision needs to be taken.

    Work result The cases provide initial data, a test order and a reasoned sample decision. Change a concrete condition and check the impact.

    Select Case studies