EU AI ACT · IMPLEMENTATION GUIDE

Separate AI reporting paths

Use a chronology with its own triggers, receivers and transmitting receipts.

ROLE
DEPLOYMENT
OVERSIGHT

Check separate reporting tracks on your own system

Define a common identifier, UTC time base and original observation for an event. Each obligation is subject to the legally relevant knowledge, confirmed classification and shipment separately. Responsibility remains with the respective operator, provider, financial company or CRA manufacturer.

The work help calculates selected first and subsequent steps after you have confirmed the path professionally. An expected time does not replace the obligation to report immediately. For special cases, weekend rules or different case groups check the relevant rule. The Art. 55 model incident is followed separately.

Lead triggers and receivers as own tracks

  1. Knowledge and classification in two watches lead

    Calculate the previous brand as a rule. Check special cases such as classification after more than 24 hours and weekend rules on wording.

    Testable evidence Separate time records and traceable reporting path per stage.

  2. Knowledge of the relevance for the NIS2 service

    Secure your own knowledge of the significant incident and the actual submission to the relevant reporting authority.

    Testable evidence Timeline with 24 and 72 hour mark as well as one transmission receipt each.

  3. Use or safety incident on the product

    Confirm manufacturers, product version concerned, appropriate case group and their own knowledge. Check the next report based on its requirements.

    Testable evidence Reporting track per product with knowledge, updated information and receipt.

  4. Check the AI link and maximum mark independently

    Confirm the actual type of incident, relevant knowledge and immediate response after establishing the relationship or sufficient probability.

    Testable evidence Independent AI sign with proven knowledge, triggering findings and shipping.

Open additional checkpoints in the article register

An event with four legal triggers

A fictitious operating disruption on September 14, 2028 concerns Bank, independent IT service and a product with digital elements delivered.

Reconstruct four reporting tracks and check permissible time limits.

What you decide

A comprehensible chronology with separate traces and own examination of the immediate action.

Edit case · An event with four legal triggers
DORA at 8 o'clock with 10.15 classification, NIS2 at 9.10 o'clock, CRA at 10 o'clock, AI at 11.25 associated 11.45 clock.
DORA at 8 o'clock with 10.15 classification, NIS2 at 9.10 o'clock, CRA at 10 o'clock, AI at 11.25 associated 11.45 clock.

The timeline shows the exercise case of 14 September 2028 in UTC. DORA and the EU AI Act each have two established times. Determine the decisive trigger for each deadline separately.

Documenting your own test

A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.

  • Four separate time-base tracks

    Arrange filled-in UTC fields to the confirmed legal and case path. Compare shipping and calculated computed marks with original documents.

    Outcome A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.

    Read the instructions

    Fictional example KI23 · DORA starts with 08.00 and 10.15. NIS2 uses 09.10, CRA 10.00 and the AI track 11.25 with additional connection detection.

    1. The starting position Keep chronology and relevant triggers
    2. Editing the Process Special case, immediate reaction and calculation mark separately check
    3. Secure Decision Submission by competent authority

Delimiting the CRA message for the specific product

  • Reporting route and deadlines

    Regardless of the classification of the AI incident, secure the confirmed CRA trigger, reporting levels and your own financial reference.

    Check the reporting route and deadlines

Connection check for this product stand or incident

  • Co-ordinate notifications from manufacturers and operators

    The manufacturer and two regulated operators need a common documentation chronology and each one has its own levy.

    View the guide

Official sources

First check for this task

Other official references1

What is the next decision?

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • Report an incident separately after DORA, NIS2 and TKG

    Use a common event identifier for technical observations. In addition, keep track of the reporting role, legal basis, level of knowledge and confirmed classification for each company concerned and every performance involved.

    If the NIS2 service also has specialist law, you can assign this independent reporting run.

    Your decision Determine your own starting point for each reporting route and confirm the dispatch of the next message.

    Work through the case
  • CRA and AI after an update

    If the product is corrected, check its range and assignment to the delivered version.

    Starting point Build and operation status, component list, proof of correction, previous explanation and technical test after the update.

    Work result Two separate release tracks with reproducible version matching, correction status and documented further procedures.

    View the guide