Separate AI reporting paths
Use a chronology with its own triggers, receivers and transmitting receipts.
DEPLOYMENT
OVERSIGHT
Check separate reporting tracks on your own system
Define a common identifier, UTC time base and original observation for an event. Each obligation is subject to the legally relevant knowledge, confirmed classification and shipment separately. Responsibility remains with the respective operator, provider, financial company or CRA manufacturer.
The work help calculates selected first and subsequent steps after you have confirmed the path professionally. An expected time does not replace the obligation to report immediately. For special cases, weekend rules or different case groups check the relevant rule. The Art. 55 model incident is followed separately.
Lead triggers and receivers as own tracks
Knowledge and classification in two watches lead
Calculate the previous brand as a rule. Check special cases such as classification after more than 24 hours and weekend rules on wording.
Testable evidence Separate time records and traceable reporting path per stage.
Knowledge of the relevance for the NIS2 service
Secure your own knowledge of the significant incident and the actual submission to the relevant reporting authority.
Testable evidence Timeline with 24 and 72 hour mark as well as one transmission receipt each.
Use or safety incident on the product
Confirm manufacturers, product version concerned, appropriate case group and their own knowledge. Check the next report based on its requirements.
Testable evidence Reporting track per product with knowledge, updated information and receipt.
Check the AI link and maximum mark independently
Confirm the actual type of incident, relevant knowledge and immediate response after establishing the relationship or sufficient probability.
Testable evidence Independent AI sign with proven knowledge, triggering findings and shipping.
An event with four legal triggers
A fictitious operating disruption on September 14, 2028 concerns Bank, independent IT service and a product with digital elements delivered.
Reconstruct four reporting tracks and check permissible time limits.
A comprehensible chronology with separate traces and own examination of the immediate action.
Edit case · An event with four legal triggersThe timeline shows the exercise case of 14 September 2028 in UTC. DORA and the EU AI Act each have two established times. Determine the decisive trigger for each deadline separately.
Documenting your own test
A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.
Four separate time-base tracks
Arrange filled-in UTC fields to the confirmed legal and case path. Compare shipping and calculated computed marks with original documents.
Outcome A reproducible event file with separate reporting periods, documented special cases and own transmission receipts.
Read the instructions
Fictional example KI23 · DORA starts with 08.00 and 10.15. NIS2 uses 09.10, CRA 10.00 and the AI track 11.25 with additional connection detection.
- The starting position Keep chronology and relevant triggers
- Editing the Process Special case, immediate reaction and calculation mark separately check
- Secure Decision Submission by competent authority
Delimiting the CRA message for the specific product
Reporting route and deadlines
Regardless of the classification of the AI incident, secure the confirmed CRA trigger, reporting levels and your own financial reference.
Check the reporting route and deadlines
Connection check for this product stand or incident
Co-ordinate notifications from manufacturers and operators
The manufacturer and two regulated operators need a common documentation chronology and each one has its own levy.
View the guide
Official sources
First check for this task
Regulation (EU) 2024/1689 as amended on 27 July 2026
Readable version with the changes made by Digital Omnibus on AI. The application rules are to be read for your own deadline.
Article 5 Delegated Regulation (EU) 2025/301 · Reporting levels
Arrange knowledge, classification and actual dispatch of the respective reporting level. Check different cases separately.
§ 32 BSIG · Reporting of significant security incidents
Confirm the knowledge of relevance for the institution concerned and the official reporting process.
Other official references1
- Article 14 CRA · Manufacturers' reporting obligations (opens in new tab)
EUR-Lex · CRA 2024/2847
Distinguishing actively exploited vulnerabilities and serious security incidents. Evidence and completion reference must be given for the confirmed path.
What is the next decision?
Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.
Report an incident separately after DORA, NIS2 and TKG
Use a common event identifier for technical observations. In addition, keep track of the reporting role, legal basis, level of knowledge and confirmed classification for each company concerned and every performance involved.
If the NIS2 service also has specialist law, you can assign this independent reporting run.
Your decision Determine your own starting point for each reporting route and confirm the dispatch of the next message.
Work through the caseCRA and AI after an update
If the product is corrected, check its range and assignment to the delivered version.
Starting point Build and operation status, component list, proof of correction, previous explanation and technical test after the update.
Work result Two separate release tracks with reproducible version matching, correction status and documented further procedures.
View the guide

