EU AI ACT · IMPLEMENTATION GUIDE

GPAI in the supply chain

Distinguishing model providers, system providers and operators based on the specific service.

ROLE
DEPLOYMENT
OVERSIGHT

Check general-purpose AI models on concrete use

Run the model version, its provider and the system that uses this model separately. Check with the model provider the role and applicable obligations for technical documentation, information for downstream providers, copyright strategy and public summary of training content. The obligations for this system remain a separate consideration with the provider of a system.

Open licensing can influence clearly defined requirements of Art. 53. Check the prerequisites and the presence of systemic risks for this purpose. In a GPAI model with systemic risk, the tasks of Art. 55 are added. Determine specific questions from a publicly available model report concerning the version you use.

Separately assign model and system

  1. Check the documented classification of a model stand

    If you consider which provider assesses the systemic risk path on which basis and what classification is available for the delivered level. If the information provided for M2 refers to the classification of M1, a question remains open.

    Testable evidence Dated version and classification dossier with relevant source.

  2. Match information, copyright and publication

    Request the relevant documents per model and check restrictions on open licensing for exact requirements. Check whether the published summary of the actual model version is to be attributed.

    Testable evidence Model file, including information on the dissemination, strategy and public summary where relevant.

  3. Finding documentation for model supervision

    For a model, provide the technical documentation with status, scope and reliable location. Select information about an update and document its time classification.

    Testable evidence Versioned audit report for documentation.

Further checkpoints in the Article Register

Replace a GPAI model

The old AI model for internal document assistance was first made available in the EU on 15 July 2025. For the successor, the provider confirms January 19, 2027. In the test, the new model refers in two out of eight tasks to documents that are blocked for the user role.

What you decide

Reason the relevant application date per model version and then decide separately on the release of document assistance.

Edit Case · Replace a GPAI Model

Templates and worksheets

Use the workbook for your own data and calculations. The fillable quick view contains a sample sample and a protocol for your own process.

  • Supplier file and GPAI model change

    Compare model and system version, vendor role, handed proofs and the actual repeated function checks.

    Outcome A delivery release that identifies documentation gaps and open professional samples separately.

    Read the instructions

    Fictional example KI06 · Six of eight tasks exist with M2. The documents describe M1. Even eight correct answers would not clean up the wrong documentation version.

    1. The starting position Model, system and deployment separately
    2. Editing the Process Matching transfer requirements per roll
    3. Secure Decision Evaluate change, release and return

Official sources

First check for this task

Other official references3

What is the next decision?

Choose the work path that fits your open decision. The descriptions show what you start with and which proof you then hold.

  • Purchase and roller change

    Secure information, change notification and transfer when system, purpose or responsible changes.

    Starting point Contract and performance system, provider's instructions, amendment with previous-after-purpose and current version documentation.

    Work result A comprehensible role and release decision with open documents, responsibility and stop criteria.

    View the guide
  • Application data

    Determine the relevant date per obligation, version and use.

    Starting point Role, mandatory consideration, version history, documented deployment date and scheduled deployment start.

    Work result A time-limit sheet with a confirmed legal basis, date of application, intermediate dates and separate existing decision.

    View the guide