Plan NIS2 security measures
Put risk assessment, protective measures and effectiveness tests in a common work plan.
IMPLEMENTATION
EVIDENCE
Connecting requirements, risk and actual impact
Take the services as a starting point and record necessary systems, involved persons, locations and external services. Evaluate failure, impairment of data and organizational dependencies with the same criteria. The risk assessment shall take the selection of appropriate and proportionate measures.
Determine all ten minimum areas of § 30 para. 2. Per area, it must be possible to see how the institution concerned treats the requirement in concrete terms. Check the priority technical specification according to § 30 para. 3.
So you go ahead
Evaluate risks to real services
Select at least one technical, operational and external cause for a service. Describe impact, risk burden limit and technical or organizational treatment.
Work result Risk register with service and action reference.
Complete ten minimum fields
Arrange concrete protective measures to the legal areas. The workbook presents ten test fields, observable target values, responsible roles and own supporting references.
Work result Action plan with sources and decision per obligation.
Comparison of effectiveness with purpose and is
Test a measure with a sub-sample and a negative sample. If the proof is missing or the repeat sample fails, the open point remains visible.
Work result Test result with correction, follow-up and responsible decision.
A management order leads to the decision via an observed sample. An incorrect effect returns to the examination with concrete remedy.
Test example and counter-probe
Situation
The identity service carries order registration, warehouse and supplier portal. In the event of a failure, user logins are blocked. The company checks separately the technical operation, the secured emergency access and the observed influence on the order acceptance.
Negative test
A laboratory test shows that two systems need the same re-establishment access. The facility adapts measures and accountability and re-examines the detour in a released exercise process.
Work aids for your operation
Use the predictable template and check the result with the fully described example.
Measures and efficacy samples
Arrange the ten fields of action. Treat test criteria, measurement, detection, findings and retest in the same work position.
Outcome Summary of measures with observed effect and pending retests.
Read the instructions
Fictional example A back-up is achieved in 88 minutes. The sample from the department is missing. The measure remains open until the agreed result is fully documented.
- Select criterion and type of test The ten action fields bear prepared examples. Set the appropriate yes-no criterion or a measurable setpoint.
- Record impact and evidence Refer to the target and is on the same performance and the relevant time.
- Track deviation and follow-up Record correction order, re-result and receipt with the same verification identifier.
Evaluate the level of action in relation to
Transfer the services, prioritized risks and existing evidence of impact to a structured self-assessment. Keep open controls with responsibility.
Select NIS2 on EUGRC.AIOfficial references for this task
First check for this task
§ 30 BSIG · Risk management measures
For each relevant service, combine risks, ten fields of action, evidence and effectively verified effect. § 30 para. 3 gives priority to the technical requirements of the DVO for the providers covered there.
Art. 21 NIS2 · Risk management in cybersecurity
Determine verifiable criteria from the risk analysis for all ten policy areas. Consider applicability, proportionality and additional technical regulations.
Art. 2 DVO (EU) 2024/2690 · Technical and methodological requirements
Check the Annex per provider, service and risk. Where the Appendix contains a condition such as adequacy, applicability or feasibility, you can document the assessment in a comprehensible manner.
Other official references1
- Annex 2 · (EU) 2024/2690 · Risk management and verification (opens in new tab)
Technische Vorgaben · (EU) 2024/2690
Link risk assessment, treatment, documented review and independent evaluation to the same extent.
Evaluate risks and plan measures to be verifiable
Mapping services and technical dependencies
Connect the services, systems, data and necessary suppliers in a verifiable view.
Service-related inventory with traceable owner, update date and tested dependencies.
View the guidePrioritize risks to actual default
Deriving from effects, dependencies and existing evidence prioritized test orders.
A prioritized and well-founded audit order per service with supporting documents and verifiable resubmission.
View the guideEstablish a plan of measures with acceptance criteria
The ten risk fields translate into a responsible implementation and the same performance.
A clear responsibility, verifiable objective, documented observation and follow-up date.
View the guide
Prove protection in the operation and effect of the measure
Safe operation
A change, configuration or access must be checked during operation.
Check rights, system states, cryptography and emergency communication on specific operations.
Work result The agreed target state and the observed operating status bear the approval or an open finding.
Management
You must jointly examine time, data and technical resumption.
The same exercise is used to demonstrate the re-start time, data level and technical acceptance.
Work result A reasoned decision to resume with measured time value, data level and subject sample.
Supply chain
The effective performance of an immediate provider is still unclear.
Track a direct provider from selection to proven replacement solution.
Work result A decision on release, restitution or replacement with a sample at the service concerned.

