What you decide and prove

A change of operation can affect the necessary remote processing, even if firmware, contract and device presentation remain unchanged. Compare the actual responsibility for the development and dependence of the product function. Capture the changed configuration in the same product dossier.

Check the influence of the change on the intended purpose and compliance with the basic cybersecurity requirements. Prepare acceptances for the specific environment used. Select a measurable criterion, suitable samples and a verifiable effective relapse possibility.

Before switching, determine who will notice a interruption, who may stop product release and who will switch back the previous processing in a controlled manner. Bring together test report, delivery status, responsibility and remaining restrictions.

Warning time and relapse certificate

Four locations receive the warning within 60 seconds. Two are received only after 95 seconds.
Four locations receive the warning within 60 seconds. Two are received only after 95 seconds.

Two locations miss the warning time. For a release, the team also needs to reset in the target environment.

Edit the test step by step

  1. Describe the remote function and change needed

    Show which promised function is missing without remote processing. Arrange old and target operation and the development responsibility.

    Testable evidence Version and sequence comparison including the remote function responsible.

  2. Check conformity and timely warning

    Test the six locations with the same measurement and time base. Evaluate whether the modified effect affects compliance.

    Testable evidence Six individually assigned observations and documented change effects.

  3. The reactivation under comparable conditions proves

    Check the intended reactivation and restart of the warning chain with appropriate permissions and receivers.

    Testable evidence Reproducible follow-up and release decision for the new plant version.

After the change of operation warnings come too late at two locations

A manufacturer of connected temperature sensors will be able to operate the central warning processing by another service provider in future. The own manufacturer remains responsible for the development of the necessary remote function. The purpose "Warning if limit value is exceeded" remains the same.

The exercise is considered to be a release standard with a warning within 60 seconds for each of six representative locations and a successful response in the intended environment. Four locations are located in the target, two receive the indication only after 95 seconds. The feedback has so far only been tested in a separate laboratory environment.

What you'll find out in the case

A clearance decision per released stand with user impact, responsibility and recoverable re-test.

Editing the Practice Case

Templates and worksheets

  • Product change and new release

    Compare original purpose, new effect, requirements and documented release of the amended version.

    Outcome Reasoned decision on the amendment with open tests per product level.

    Read the instructions

    Fictional example After a change in purpose, four out of six documents are transferable. Two documents and the new release are missing.

    1. Identify the starting situation Record the old and the target with purpose and source.
    2. Run the test The test shall be carried out in accordance with the following procedures:
    3. Secure decision and evidence Confirm approval including new test route and remedy.

Official sources

What depends on your result?

  • Replace third component with discontinued care

    A direct software component is also affected by the operation change. Open their version and maintenance in the same release.

    View the guide
  • Release laboratory

    Practice the release decision with a modified relapse monitoring.

    Start exercise