CRA · LEGAL SOURCES

CRA article register

Find articles and annexes with links to official wording and checks for your product.

PRODUCT
CONFORMITY
MAINTENANCE

From CRA article to verifiable proof

The register opens up all 71 articles and eight annexes. Start with the article number, a keyword or a legal area. You will find concrete test orders, counter-samples, case examples and linked work equipment on practical topics.

Use the test matrix for a systematic examination of Annex I. For market reference, publication or continuation, open the linked official find site in the version relevant to your date of reference.

Requirements and test points

CRA · Article Register

Art. 31 · Release and keep up to date technical documentation

Addressee Manufacturers and technical editors

Link risk, decision, examination and declaration before placing on the market with the actual product.

Measures, evidence and sampling

Paragraph 1CRA-A31-001

Repeat the same criterion after correction

Perform the initial start sample at the corrected delivery level and check the passing of the appropriate profile.

Testable evidence
After-test with documented deviation or effective release.
Sample
Perform eight suitable first starts in the laboratory and leave the old version ID in the release dossier at the same time. The content of the results is documented in the exercise, the assignment to the delivered stand remains to be confirmed.

Paragraphs 1 and 2CRA-A31-002

Track the product identity through all documents

Compare marking and technically delivered version with the rated and explained version.

Testable evidence
Version comparison with precisely designated documents.
Sample
Correct the explanation to version 2.4 and attach a report to version 2.3. The document name now agrees with the delivery, the product evaluation remains open.

Version related documentationCRA-A31-003

Repeat the correct negative test

Use the prepared unsuitable test package in the completed test setup and check the documented reference. Confirm that the existing function has been retained.

Testable evidence
Independent counter-test with verifiable result and confirmed function test.
Sample
If you detect a confirmed rejection, leave the proof of the warning function after the update empty. Update acceptance and protection against the unsuitable package are observed. The release of effects remains open due to the lack of functional evidence.

Paragraphs 1 and 2CRA-A31-004

Documenting the decision and its scope

In the sample, block the release of 3.2 until the proven transferability or re-start test. Name the next processor.

Testable evidence
Decision-making note with references and verifiable follow-up order.
Sample
Complete a signed release note to version 3.2 and leave the old restart report unchanged. The signature confirms the processing. The statement on effect in 3.2 still needs a reliable document.

Updated documentationCRA-A31-005

Check validly after the next procedure

Repeat the run with the original scale and check the unchanged function. Arrange the decision exactly to the new delivery version.

Testable evidence
Comparable financial statements or scheduled follow-up.
Sample
Complete nine raw times of no more than three minutes each and accidentally take over the old product status in the report. The times fit to the target. The assignment to the corrected delivery version must be further proven.

Paragraph 2CRA-A31-006

Test actual availability

Get file, user information and update under the role and product identifier provided for each category.

Testable evidence
Dated retrieving sample with jurisdiction and secured resubmission.
Sample
In the pattern, set the end of support to September 30, 2046. The later end of support will also be decisive for the existing security update. Then check the new storage and access proof.

Paragraphs 1 and 2CRA-A31-007

Partial findings and open criteria document

Confirm confirmed partial effects. Keep the follow-up test for complete and unambiguous acceptance open.

Testable evidence
Decision by criterion and clearly limited re-order.
Sample
Capture 80 records in 14 minutes, but two of them are part of the same process identifier. Evaluate the sample by the number of unique initial operations. The total number of records does not change the missing coverage.

Supervision instructions and interpretation

Editorial guidanceCRA-FAQ-013

Are all passed tests of a group sufficient to release the total stock?

A test program must cover the relevant conditions and product variants. Describe the planned scope, valid samples and observed effect separately.

For your exam Complete a successful sample from an already recorded group instead of one from the missing group.

Editorial guidanceCRA-FAQ-014

Do all archive periods start on the same day?

Technical documentation, explanation and user information refer to the placing on the market. An update provided during support has its own trigger. In both cases, compare the longer duration of each.

For your exam Move the date of the update and see which map tag changes.

Related provisions

Other official references4

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Official sources

First check for this task

Other official references27