CRA · IMPLEMENTATION GUIDE

Replace a third-party component

Check the effect of a component change on protection, detection and product release.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

A discontinued component may endanger the further maintenance of the delivered product. Find out which versions and device variants the component actually uses and how long the manufacturer must support the products. Use a comprehensible package stand and the well-maintained software piece list for this purpose.

Compare replacement, verifiable self-care or otherwise mandatory support. Check for the chosen remedy permitted use, origin, promised care, observable product effect and execution at the correct delivery level.

For unaccompanied variants, create a separate remedy order that should be effective before the end of the previous care. Compile documents for each variant on the planned care. An updated list of parts shows the component status. You can also ensure the effect of the change with a comparison test.

Edit the test step by step

  1. Deriving the affected population from delivery

    Determine the delivered version identifier and the package stand associated with the affected component per variant.

    Testable evidence List of 46 comprehensiblely affected variants and locations.

  2. Sample replacement and compatibility

    Check source, future care and export effect per variant. Distinguish the confirmed replacement assumption from the mere plan.

    Testable evidence 44 covered variants and two named gaps.

  3. Close gaps before the end of the previous care

    Confirm the responsible person and effective way for open variants. Then test the determined status and update the SBOM.

    Testable evidence Timely secured maintenance plan with supporting documents for all the variants concerned.

When replacing a library, two device variants remain unscathed

A manufacturer supports a measuring instrument until the end of 2034. The library for data export is maintained by the previous supplier only by the end of February 2030. The manufacturer counts 46 delivered device variants that use the building block.

The replacement package is the described export sample for 44 variants. Two older versions do not accept the replacement due to their confirmed technical requirements. The team has so far neither a secured self-care nor a confirmed replacement plan for these variants.

What you'll find out in the case

A durable cover per product variant with remedy, time limit and verifiable new delivery.

Editing the Practice Case

Templates and worksheets

  • Component change and maintenance cover

    Arrange out-of-date care and occupied replacement supply to all product variants that are actually affected.

    Outcome Remaining stocks per product variant with a fixed and effectively decommissioned remedy.

    Read the instructions

    Fictional example 44 out of 46 variants are covered by technical and contractual agreements with an expiring library.

    1. Identify the starting situation Confirm the variants concerned by means of installation and delivery documents.
    2. Run the test The effectiveness and maintenance of the replacement level per group.
    3. Secure decision and evidence Edit the open rest before the previous care expires.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Determine further supported software versions

    If an alternative is offered, check who can actually use it and what costs will be incurred.

    View the guide
  • Decrease security update with negative test

    For a released replacement version, test the immediate update path to the actual device.

    View the guide