CRA · CASE STUDY

Two devices lack a replacement library

Decide how two variants are supplied with an unkept component.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A manufacturer supports a measuring instrument until the end of 2034. The library for data export is maintained by the previous supplier only by the end of February 2030. The manufacturer counts 46 delivered device variants that use the building block.

The replacement package is the described export sample for 44 variants. Two older versions do not accept the replacement due to their confirmed technical requirements. The team has so far neither a secured self-care nor a confirmed replacement plan for these variants.

Compare test data and consequences

  • Care goal

    Scale
    Product maintenance until the end of 2034
    Observation
    Component maintenance ends February 2030
    Follow
    Supporting connection
  • Variant cover

    Scale
    46 variants
    Observation
    44 matching export samples
    Follow
    2 Remedies open
  • Stocks

    Scale
    SBOM matching the released delivery
    Observation
    Replacement for 44 documented
    Follow
    explicitly limit release

Two variants need their own care route

The replacement works with 44 of 46 variants. Two versions require a connection plan.
The replacement works with 44 of 46 variants. Two versions require a connection plan.

Name the two open variants and set an appointment for effective care before the end of the previous care.

Edit the test step by step

  1. Deriving the affected population from delivery

    Determine the delivered version identifier and the package stand associated with the affected component per variant.

    Testable evidence List of 46 comprehensiblely affected variants and locations.

  2. Sample replacement and compatibility

    Check source, future care and export effect per variant. Distinguish the confirmed replacement assumption from the mere plan.

    Testable evidence 44 covered variants and two named gaps.

  3. Close gaps before the end of the previous care

    Confirm the responsible person and effective way for open variants. Then test the determined status and update the SBOM.

    Testable evidence Timely secured maintenance plan with supporting documents for all the variants concerned.

Worked decision and negative test

Decision in case

The 44 samples passed support the replacement for the tested variants. For two device variants, an effective connection is missing until the end of the intended product maintenance. Please identify this gap with responsible role and remedial date.

Close the entire process only after a confirmed remedy at the respective product status. Continue documenting when and where the replacement version was delivered.

Counter-sample and impact

For both open variants, submit a contract by the end of 2034 and change the package allocation in the sample to another type of device. The contractual care is documented. Product reference and technical effectiveness remain to be confirmed.

Templates and worksheets

  • Component change and maintenance cover

    Arrange out-of-date care and occupied replacement supply to all product variants that are actually affected.

    Outcome Remaining stocks per product variant with a fixed and effectively decommissioned remedy.

    Read the instructions

    Fictional example 44 out of 46 variants are covered by technical and contractual agreements with an expiring library.

    1. Identify the starting situation Confirm the variants concerned by means of installation and delivery documents.
    2. Run the test The effectiveness and maintenance of the replacement level per group.
    3. Secure decision and evidence Edit the open rest before the previous care expires.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Replace third component with discontinued care

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Determine further supported software versions

    If an alternative is offered, check who can actually use it and what costs will be incurred.

    View the guide
  • Decrease security update with negative test

    For a released replacement version, test the immediate update path to the actual device.

    View the guide