Test remote functionality after an outage
Test basic function, data retention and restart in case of remote connection failure.
CONFORMITY
MAINTENANCE
What you decide and prove
Determine which remote processing is necessary for the product purpose and what basic function must be used during an interruption. Set observation, counting base and behavior after recovery for the concrete state.
Check the behavior in a controlled environment intended for release. Determine on a defined initial list the actual usable replacement operation as well as the complete and unambiguous re-entry of the processes. Determine the load effect on downstream services separately.
Check time limit and inventory separately
The duration is in the target example. For release, the comparison must confirm all 80 unique processes.
Edit the test step by step
Define for interruption and reconnection
Vote product profile, period, observable local effect, allowable duration and the counting base.
Testable evidence Test plan with unique process identifiers and selected load limit.
Local operation and takeover testing
Secure the confirmation of each booking. After reconnecting, compare the list of unique operations with the initial list and record duration and observed load.
Testable evidence Sheet with missing and multiple recorded events as well as time reference.
Partial findings and open criteria document
Confirm confirmed partial effects. Keep the follow-up test for complete and unambiguous acceptance open.
Testable evidence Decision by criterion and clearly limited re-order.
Eight out of 80 records are missing after reconnection
A networked goods reader performs local bookings for the inventory. The necessary remote function assigns them to the common inventory. The acceptance simulates a pre-determined interruption. All 80 test bookings must be locally usable and, after reconnection, appear in the common inventory in no more than 20 minutes and without double recording.
The device confirms all 80 operations during the period shown. After 14 minutes, the service displays 72 unique bookings. Eight are missing. In the 72 transactions accepted, the examiner will not find any duplications. The neighbouring test application remains in the agreed load range.
Acceptance file with separate proof of replacement operation, completeness, time and impact on dependent services.
Editing the Practice CaseTemplates and worksheets
Replacement operation and complete readmission
Check a necessary remote function using clear procedures before, during and after a controlled interruption.
Outcome Acceptance protocol with inventory, duration, duplication and impact on further services.
Read the instructions
Fictional example 80 operations are confirmed locally. 72 are clearly taken over in 14 minutes.
- Identify the starting situation Set time limit and unique test procedures.
- Run the test Measure local observation, duration and net take-over separately.
- Secure decision and evidence Keep the detection limit and check corrected status.
Official sources
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Responsibility of manufacturers of digital products
Compare preparation, product release and care with your own manufacturer role.
Guidelines for the application of CRA
Check inter alia the remote processing, expected use and delimitation to other legal acts.
What depends on your result?
Re-route necessary remote processing
Check the operator change additionally when version, responsibility or environment of the remote function change.
View the guideTest replacement operation and return to regular supply
Determine your own service targets and operational resumption samples from the product records for a captured operator.