CRA · CASE STUDY

A cold-storage warning comes late

A warning must arrive in eight minutes.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A networked monitor ensures the warning in a cooling hall. Production clearance has so far covered a permanent connection hall. The manufacturer also wants to use the monitor in a second hall with temporarily missing connection.

For the replacement warning in this environment, the team sets an internal target of no more than eight minutes before the attempt. The controlled test with the intended configuration results in 18 minutes between deviation and visible warning. In the first hall the original warning continues to work.

Compare test data and consequences

  • Target environment

    Scale
    Replacement warning for temporary separation
    Observation
    Second hall differs
    Follow
    Add risk assessment
  • Warning time

    Scale
    Not more than 8 minutes
    Observation
    18 minutes in valid trial
    Follow
    10 minutes over target
  • Age of use

    Scale
    Separated
    Observation
    Initial warning effective
    Follow
    Document the extent of the authorisation

The warning time in the new operating environment

The internal limit is eight minutes. Watched were 18 minutes until the visible warning.
The internal limit is eight minutes. Watched were 18 minutes until the visible warning.

Compare the minutes in actual use. If another environment leads to a shorter time, first prove comparability.

Edit the test step by step

  1. Keeping the context change comprehensible

    Compare warning path, connection dependence and the responsible body in both environments.

    Testable evidence Entry for new use with evidence of the changed conditions.

  2. Evaluate the risk by means of an appropriate evidence of action

    Link the replacement warning to the requirement and the pre-confirmed time scale. Arrange the sample of the target environment.

    Testable evidence Observation of 18 minutes at eight minutes.

  3. Confirm the use and separation of the affected persons

    Limit the release to the occupied stand in case of a case. Plan correction and repetition of the original time scale in the new hall.

    Testable evidence Dated risk and clearance decision for both environments.

Worked decision and negative test

Decision in case

The deviation is related to the new application. The previous documents support the first hall. For the second hall, the application in the sample remains open until the corrected and comparable effect certificate.

Adjust risks, relevant documentation and possible limits of use. Then assess whether the released protection is observed in actual operation under the changed condition.

Counter-sample and impact

Use a permanent connection in the after-test and measure for six minutes. The time is reached in the laboratory. The test-proof connection does not correspond to the new indoor environment. The decision to use this environment remains open.

Templates and worksheets

  • Change of use and protective effect

    Evaluate the changed environment and compare its observed protective effect with the agreed scale.

    Outcome Updated risk assessment with release scope and action per environment.

    Read the instructions

    Fictional example In a second hall, the replacement warning takes 18 minutes instead of at most eight.

    1. Identify the starting situation Document purpose and changed usage environment.
    2. Run the test The first is that the data are not available for the first time.
    3. Secure decision and evidence Decide on the scope and follow-up of the application.

Official sources

What depends on your result?

  • Update Risk Assessment at Use

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Set the test programme and sample

    Apply the additional environment to the test plan and vote for the next sample.

    View the guide