CRA · CASE STUDY

A new release site needs approval

A class II hypervisor gets a new location.

SCOPE
ASSESSMENT BODY
APPROVAL

Starting position and test order

A manufacturer develops a hypervisor delivered independently. The core function and technical description result in an important product of class II in the case of instruction. He selects module H. The valid scope of the notified body and confirmation for the previous development and release site are documented.

In future, a second location will be opened up. Internal samples will exist. The manufacturer has notified the body of the intended change in the approved quality system. A documented decision by the body whether the modified system must be met or re-evaluated is missing. Otherwise, the previous workflows will remain.

Compare test data and consequences

  • Product category

    Scale
    Class II, which is based on the following criteria:
    Observation
    Core function and category confirmed
    Follow
    Documenting the Authorized Way
  • Number of posts

    Scale
    Module and product recorded
    Observation
    Official entry confirmed
    Follow
    The job is available
  • Amended quality system

    Scale
    Decision on enlargement intelligible
    Observation
    Internal samples pass, decision is missing
    Follow
    Reset new location

The approved scope and the new location

The decision on the existing quality system is pending in case of a confirmed product class and notified body. The new location still needs to be assessed.
The decision on the existing quality system is pending in case of a confirmed product class and notified body. The new location still needs to be assessed.

Determine the actual scope of the job decision. The internal sample remains a separate document.

Edit the test step by step

  1. Deriving the path of conformity from category and delivery level

    Determine core function, product class and permissible alternatives. Reason module H for the selected product scope.

    Testable evidence Dated procedural decision with official reference and responsibility for release.

  2. Notification and quality system

    Open the official entry of the body. Compare the notification scope with product and module. Find out if the new process is captured by the confirmed quality system.

    Testable evidence Match with the location of the discovery and understandable status of the decision on the change.

  3. Treating site changes in a comprehensible way

    Secure the notification of changes, the response of the body and related documents. Document the actual delivery status of the existing proof.

    Testable evidence Release scope and additional verification order prior to use of the new site.

Worked decision and negative test

Decision in case

The extent of the existing delivery route remains the basis for the existing delivery route. The manufacturer documents the open extension for the second location and uses it for approval in the case of training only after a clear decision by the competent body.

The good internal sample remains as own evidence. It documents the observed work and does not replace the missing procedural reference.

Counter-sample and impact

Take a general audit certificate from the second location into the file. Check whether the change of the approved system and the relevant module H scope have been decided. The open delivery route remains open without this reference.

Templates and worksheets

  • Scope of procedure and release with module H

    Connect product category, notified body, confirmed quality system and decision to change.

    Outcome Procedural file with documented scope of proceedings per location and concrete clearance decision.

    Read the instructions

    Fictional example The second site is internal samples. The decision of the location to change system is missing.

    1. Identify the starting situation Assign product core function, category and evaluation method.
    2. Run the test Comparing the level of notification, approved system and amendment
    3. Secure decision and evidence Document the extent of release and job decision.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Check Module H and job size

    Transfer the same test criteria to your own product and save the different starting data.

    Examine the scope of proceedings
  • Clear type modification with notified body

    In alternative path B and C, check the range of the type certificate and corresponding serial documents instead.

    View the guide
  • Verify standard level and coverage

    Check the actual coverage of the standards used and the official reference published for that purpose.

    View the guide