CRA · CASE STUDY

A trade-show prototype goes on sale

A trade fair prototype is clearly marked.

PRE-PRODUCTION
OFFER
APPROVAL

Starting position and test order

A developer is preparing a networked measurement adapter in February 2028. At a trade fair he shows a prototype that is not yet compliant with the requirements of the standard. The prototype is not available there. In the case of instruction, no safety component is available for separate, unfinished diagnostic software. It is only available for an agreed ten-day user test with appropriate marking.

In the EU version of the shop, an end user can buy the same adapter that has not yet been released. Order and shipping address have been confirmed in a controlled preview. The offer text only contains the note "Pre-series". The edition in the online shop and the exhibition stand are managed separately.

Compare test data and consequences

  • Fair

    Scale
    Visual display
    Observation
    Prototype shown, note met
    Follow
    Demonstration possible in the case of teaching
  • Unfinished Software

    Scale
    Test purpose and required duration
    Observation
    10 days, notice, no safety component
    Follow
    Time-limited test documented
  • Webshop

    Scale
    Compliance with EU sales offer
    Observation
    Order possible, release open
    Follow
    Discontinue sale offer

Three ways of using the same product development

The trade fair prototype is marked. Unfinished software is available for a test ten days. In the EU shop, the device can be ordered before release.
The trade fair prototype is marked. Unfinished software is available for a test ten days. In the EU shop, the device can be ordered before release.

Confirm the requirements per channel and document the actual customer view of the sales offer.

Edit the test step by step

  1. Track usage and access per channel

    Determine purpose, version offered, addressees and access or order with time.

    Testable evidence A list of documents with a clear separation between demonstration, software test and sales offer.

  2. Check requirements for demonstration and test software

    Secure the visible hint and for unfinished software the necessary time limit and test binding. Clear the meaning as possible safety component.

    Testable evidence Reasoned decision on Art. 4 with facts and verifiable expiry date.

  3. Connecting market supply and release

    Check the actual orientation to EU end users and the established sales route. If unexplained conformity is not met, expose it and document the subsequent release.

    Testable evidence Channel-related clearance note with verifiable correction of the offer.

Worked decision and negative test

Decision in case

The demonstration and the time-limited test meet the conditions confirmed in the exercise. The developer suspends the sales offer addressed to EU end users and maintains the adapter version concerned.

Before re-release, the responsible role confirms the actual product status and required documentation. Screenshots alone are sufficient for this release only with regard to visible changes in the offer.

Counter-sample and impact

Replace the order button with a non-binding trade fair information. Then check previous offer stands and alternative ordering paths. The current text alone is not proof of the entire sales channel.

Templates and worksheets

  • Demonstration, test software and distance selling

    Determine the demarcation for each actual offer and check the terms per channel.

    Outcome Channel-related decision with secure visual and offer proof.

    Read the instructions

    Fictional example The trade fair notice is suitable. The unreleased device can be bought in the EU shop.

    1. Identify the starting situation Track channel, product capture, purpose and actual access.
    2. Run the test Note, necessary test duration or market release.
    3. Secure decision and evidence Document output, restriction and verification.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Differentiating preliminary series and sales offer

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Product scope and remote processing

    Clear software, hardware and necessary remote function before the release confirms a concrete delivery.

    View the guide
  • Sample import and distribution on the batch

    Check the actual delivery status, information and documentation at a shipping sample later.

    View the guide