Six checks for one delivered version
One delivery, six tests and a report on the status.
CONFORMITY
MAINTENANCE
Starting position and test order
The fictitious Klarwerk GmbH wants to deliver a networked temperature monitor in version 3.2. The release team uses six internally agreed test criteria. These include the warning on the sensor, its receipt after a simulated restart and the verified assignment of the software components.
The references to the current test file for five criteria lead to the current test record.The re-start report is viewed 3.1. The current delivery list shows 3.2. Maintenance and testing have not yet used any of the documents to confirm the portability of this finding.
Compare test data and consequences
Test stock
- Scale
- 6 criteria required
- Observation
- 6 reports available
- Follow
- Check portability per report
Delivery
- Scale
- 6 Evidence for 3.2
- Observation
- 5 matching, 1 to 3.1
- Follow
- Restart certificate open
Independent retest
- Scale
- From decision to original
- Observation
- Old Report Identified
- Follow
- Completion after valid follow-up test
Six reports and five appropriate versions
Open the original receipt for each criterion. The restart remains open until the report fits the delivery version.
Edit the test step by step
The criteria along the actual delivery record
Arrange a test criterion, a responsible person and the ID of the intended product stand for each requirement.
Testable evidence Six linked criteria with verifiable version reference.
Test the return journey from inclusion to original
Open the six original documents. Check order reference, version and observed effect.
Testable evidence Five confirmed evidence and an explicitly open old report.
Documenting the decision and its scope
In the sample, block the release of 3.2 until the proven transferability or re-start test. Name the next processor.
Testable evidence Decision-making note with references and verifiable follow-up order.
Worked decision and negative test
Decision in case
The five current documents bear their respective criteria. The old restart report only bears the release of 3.2 when the transferability has been verified or the same effect on 3.2 was observed. Therefore, the decision remains open.
In the second test, a qualified person must find out from one criterion the observation of the correct version and the release decision. The file will be used for later requests.
Counter-sample and impact
Complete a signed release note to version 3.2 and leave the old restart report unchanged. The signature confirms the processing. The statement on effect in 3.2 still needs a reliable document.
Templates and worksheets
Release and tracing
Link test criterion, actual version, original document and release.
Outcome Checkable release track per product level and identified gap per criterion.
Read the instructions
Fictional example Six reports are available. The restart report is still in version 3.1.
- Identify the starting situation Actual delivery and the necessary criteria determine.
- Run the test Open original cover and check its range.
- Secure decision and evidence Secure decision with assigned result and follow-up order.
Official sources
Cyberresilience Regulation in text
Use the article or attachment that regulates the task to be solved.
Responsibility of manufacturers of digital products
Compare preparation, product release and care with your own manufacturer role.
Guidelines for the application of CRA
Check inter alia the remote processing, expected use and delimitation to other legal acts.
What depends on your result?
Building a release file
Transfer the same test criteria to your own product and save the different starting data.
Prepare release fileClose findings with comparable follow-up
The old report is not enough for a release. Check whether a new run meets the same original criterion.
Prepare for post-testCRA file check
Select the documents for a complete file to version 3.2 in the browser.
Practice the selection of documents