NIS2 · CASE STUDY

Cybersecurity for energy grids

Assign operator role, safe operation management, catalog and reporting point for the specific energy service

SCOPE
IMPLEMENTATION
EVIDENCE

The role of the operator determines the legal path to work

Start with a concrete network or plant-related performance. Describe who is responsible for safe operation, which systems are required and who can actually carry out changes. A grid operator is registered according to § 5c para. 1 No. 1 EnWG regardless of the size category. In the case of energy plants and digital energy services, you also check the BSIG category and the grid connection as defined in paragraphs 2 and 3.

A digital energy service allows central, cross-location access to the control system or direct influence. The decisive factors are operating rights and actual functions. In addition, you can clarify other plants and activities of the same entity. For an energy plant operated as a secondary activity, the exception of § 28 para. 5 BSIG may be omitted.

From the test order to the secured result

  1. Separate activities and system boundaries

    Per performance, open up operational responsibility, asset acquisition and the systems necessary for safe operation. On a portal, check whether changes to plants can actually be triggered using a roll sample.

    Acceptance criterion
    Justify applicability using evidenced activity or intended use, role and date. Assign an owner and due date to any unresolved assumption.
    Evidence

    The evidenced § 5c path per activity with system scope and, if applicable, open classification question.

  2. Connecting catalog and responsibilities

    Confirm the published catalogue version, addressee and start. Make a receipt of protection for call readiness, the obligation from the delivery contract and the documented management decision according to § 5e in the same process.

    Acceptance criterion
    Trace execution, review and approval to named roles. Check handover and deputy arrangements in the exercise.
    Evidence

    Verifiable assignment of requirement, performance, responsible body and observed effect.

  3. Prepare registration and notification separately

    Track the BSI registration document and the accessibility of the contact point. Check for relevance and knowledge in accordance with § 5d para. 3. Clear portal or transition-wise reporting path using the BSI instructions.

    Acceptance criterion
    Trace the submission by time, version sent and acknowledgement. Resolve missing or changed information for each reporting stage.
    Evidence

    Confirmed responsibilities and secured reporting levels for the service concerned.

  4. Checking other activities for their own obligations

    Arrange for example an additional critical water supply system or another recorded performance independently. Support which shared systems are required for this and what obligations according to § 28 para. 5 BSIG must be assessed again.

    Acceptance criterion
    Trace the decision to the agreed requirement and observed result. Assign an owner and review date to open conditions.
    Evidence

    Performance-related obligations matrix with a clear definition and clarification of possible multiple payments.

Official sources for this work path

Read the official provisions on classification of the energy services actually provided and link your assessment to the relevant source.

The actual role leads to the decision on obligations through the systems necessary for safe operation, the applicable catalogue and the notifier.
The actual role leads to the decision on obligations through the systems necessary for safe operation, the applicable catalogue and the notifier.

The actual role leads to the decision on obligations through the systems necessary for safe operation, the applicable catalogue and the notifier.

Small network operator with own reporting route

Situation Start with a concrete network or plant-related performance. Describe who is responsible for safe operation, which systems are required and who can actually carry out changes.

Situation

The fictitious HanseWerk Netze GmbH operates a public distribution network as an existing operator. It has 24 employees, 4 million. Euro turnover and 3 million Euro balance sheet total. Further BSIG activities and CRITIS are technically excluded in the initial case. A second product shows measured values from customer systems. The evaluation neither executes tax actions nor can it change the setting values.

Monitoring and evaluation

On 9 November 2026 at 09:15 UTC, the responsible team confirms a security incident that could severely disrupt network operations. It sends the early warning at 15:00 UTC that day and the incident notification on 10 November at 15:00 UTC. The worksheet records the outer limits of 10 November at 09:15 UTC and 12 November at 09:15 UTC, and the one-month date of 10 December. Document separately whether each report was sent without undue delay.

Reasoned decision

The network leads to the protection path according to § 5c (1) No. 1 EnWG. For this inventory constellation, registration in accordance with § 5d (4) EnWG including the legal old case date is to be proved. In fact, the display of the measured values does not fulfil the control function of a digital energy service.

Negative test

The operator will take over a water system that has already been confirmed as critical. Check the effects of § 28 para. 5 sentence 2 and 3 BSIG for additional activity and their IT. The EnWG path of the network remains comprehensible. The test order for the plant receives its own position.

Audit record
Comparison of the original finding and retest showing the changed condition, observed effect and closure decision.

Work result

Released allocation per energy activity, current catalog status and recalculated report calendar with source and contact point.

Working aid for your own operation

Arrange the network, plant and digital energy service of the affected operator role. Check registration, further activities and the reporting levels according to § 5d EnWG.

  • Energy obligations and incident timeline

    Arrange the network, plant and digital energy service of the affected operator role. Check registration, further activities and the reporting levels according to § 5d EnWG.

    Outcome Assignment per activity with evidence, catalogue and registration reference as well as calculated incident calendar.

    Read the instructions

    Fictional example N04 · A small existing network operator falls under § 5c (1) No. 1. An additional portal with a mere display is examined separately. The incident report of 10 November constitutes the monthly reference.

    1. Supporting the role of operators Secure actual operation, grid connection and BSIG category. In a digital energy service, the effective control function is proven.
    2. Keep registration and ancillary receipts Mark other activities and the special exception for an energy plant as a secondary activity. Write down the catalogue stand on the role.
    3. Confirm timeline and channel Calculate the detected significant incident and the actual transmitted incident report. Secure the used reporting channel.

Legal basis and official information

First check for this task

Other official references6

Delimiting specialist law and critical systems in own operation

Sectoral law

Sectoral law and BSIG may be relevant to the same organisation.

Distinguishing applicable rules for financial undertakings, energy and telecommunications per service.

Work result The legal basis, decision-making, notification and appropriate evidence are visible per obligation.

Critical installations

The scope of the installation or the official time of proof shall be clarified.

Check the installation limit, transition level, reporting route and established detection date.

Work result A documented system delimitation with separate detection and reporting order.