NIS2 · IMPLEMENTATION GUIDE

Assess critical installations

Check the installation limit, transition level, reporting route and established detection date.

SCOPE
IMPLEMENTATION
EVIDENCE

Determine the load capacity and time of detection

Start with actual operation and the rule applicable for the reference date to plant categories and thresholds. Determine when the specific new versions are to be applied from the legal transition. Keep track of installation, critical service, input data and measurement period.

Include the systems that are relevant for the operation of the plant. The concrete determination by BSI is decisive for the date of detection. For old operators, reclassified operators or an explicit exception, the decision-making process must be documented separately.

So you go ahead

  1. Holding investment, threshold reference and legal status

    Compare the actual plant category, measurement size and annual data with the relevant legal regulation. Mark which change would affect classification.

    Work result Reasoned decision with reference date and data.

  2. Operationalise additional requirements

    Determine relevant systems, supply, evasive options and attack detection. Under safe conditions, test the transfer of an approved test signal to the competent authority.

    Work result Plant limit with documented detection and further processing.

  3. Detection and remedying

    Connect the BSI determination, the procedure description to be applied, the conduct of the examination and the correction of safety deficiencies.

    Work result Installation-specific test order with commissioned body and follow-up dates.

Findings on this work path

Technical resumption requires the examination of time, data level and executed business process.
Technical resumption requires the examination of time, data level and executed business process.

Technical resumption requires the examination of time, data level and executed business process.

Test example and counter-probe

Situation

An established plant operator has a previous test bench. Another entity for the first time exceeds a threshold relevant to its actual type of plant. For both, the system type, legal status and date of detection are documented separately. In the second case, the earlier proof of the first facility cannot serve as a reference date.

Negative test

In addition, check the relevant reporting route and the installation-related information in case of a significant incident according to current BSI information.

Work aids for your operation

Use the predictable template and check the result with the fully described example.

  • Plant limit and detection planning

    Gather asset assignment, scope, set date of detection and tracking of defects.

    Outcome The test task with documented time frame was documented with sources.

    Read the instructions

    Fictional example A new operator knows his date of classification, but not yet a BSI date. The process remains open on time. An old operator carries out the concretely confirmed date with the old proof reference.

    1. Lines of installation and threshold The following are the main points of reference for the European Parliament:
    2. Documenting evidence Record the initial case, BSI date and referenced confirmation.
    3. Review and follow up on shortcomings Document the state of the art, evidence and re-examination.
  • Registration and deadlines for amendments

    Plan initial registration and changes including jurisdiction, time of knowledge, evidence and the correct version.

    Outcome Process plan with calculated calendar reference and documented shipping status.

    Read the instructions

    Fictional example The special registration begins separately with an MSP. A later change of the establishment leads to a separate deadline check from the event day.

    1. Identifying registration The start date, § 33 or § 34 and the proof of jurisdiction.
    2. Change and legal status Keep the event, knowledge and current rule separate. Document the version used when it is moved.
    3. Verify date and dispatch Special calendar or transition case check and file the portal receipt.

Official references for this task

First check for this task

Other official references5

Checking the plant limit in the health care sector

The hospital case combines approved facility, number of cases, proof planning and professional resumption.

Health and CRITIS

Limit hospital and critical equipment by means of resilient case numbers. Arrange protection obligations and evidence of the actual care provided.

Secure the scope and time of detection

  • Technical and operational boundaries between common critical installations

    List of installations with documented association decision.

    Each sub-assembly has a unique assignment. Aggregated measured values are complete and without duplicates. The limit of the tested plant network is comprehensible for operation and testers.

    Work through the case
  • Secure official detection time for critical installations

    Confirmed starting point with documented case variant.

    The plan shall include the assignment per installation, the identified legal case, the confirmed date and the early steps for supporting documents, verification and submission.

    Work through the case

Match registration and verification

Registration

The concern is certain and data or dates must be checked.

Merge the right entity, register and confirmed notification.

Work result The competent body, released output and registration confirmation are linked to each institution.

Evidence and supervision

They shall provide evidence of the audit mandate for management, internal audit or oversight.

Merge test order, efficacy test, deviation and follow-up test.

Work result A second person can understand the findings and clearance decisions from the sources.

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.