NIS2 legal register
Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.
IMPLEMENTATION
EVIDENCE
Which legal area answers the question?
For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.
NIS2 · Standards Register
Appendix 1 BSIG · Sectors and types of equipment as defined in Appendix 1
Addressee Institutions in the activities covered
Compare the real service with the specific type of facility and its legal definition. Check size level and special rules for basically relevant activities.
Measures, evidence and sampling
6.1.4, 6.1.10 and 6.1.11NIS2-DEAN1-001
Accurately assign digital operating performance
Describe operation, ongoing administration, security and contractual responsibility. Only then assign the service to the appropriate facility type.
- Testable evidence
- Extract from performance agreement, organisation of operations and documented demarcation.
- Sample
- Compare hardware delivery, ongoing remote administration and managed security monitoring.
3, 4 and 5NIS2-DEAN1-002
The sector has been the subject of a number of technical definitions
Link permission, performance and technical law to each type of institution that is considered. A general industry name does not bear the assignment alone.
- Testable evidence
- Type of establishment with specific registration, supply or operating certificate.
- Sample
- Check the business activities of a diagnostic provider and a pure supplier in the same health environment.
Appendix 1 BSIGNIS2-ARB-037
Check drinking water supply and KRITIS threshold separately
Arrange operators, waterworks and power. Check separate volume acquisition as well as the requirements of a common plant. If you have different asset categories, determine the group first. Match the confirmed annual quantity with the appropriate line in the annex. Use the treated drinking water quantity for the waterworks and document the calculation path, release and time of status change. Determine the control systems, monitoring and actual supply functions dependent on the plant. Connect the status with protection, notification and official proof.
- Testable evidence
- The category of the device and the system status are two findings. The test and detection date has a proven basis.
- Sample
- Set the confirmed processed quantity to exactly 22.0 million cubic meters. The threshold is reached. Note why the billing amount in the waterworks case does not replace the threshold decision.
Supervision instructions and interpretation
BSI orientationNIS2-FAQ-01
Can the BSI's assessment of the substance make it compulsory to determine the classification?
The evaluation is based on the own answers and serves as a guide. The legal criteria and the actual activity remain decisive.
For your exam Secure the answers together with performance figures and figures. Let a disputed case be evaluated professionally.
Related provisions
Other official references2
- Technical requirements and criteria for relevance (opens in new tab)
Implementing Regulation (EU) 2024/2690 · EUR-Lex
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
- First classification with the examination of concern (opens in new tab)
BSI · NIS 2 Affected Test
Use the evaluation as a guide and secure the decisive entries with your own documents.
Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.
Acts and official implementing aids
First check for this task
BSI Act as amended
Check the German obligation for the actual activity performed, the legal entity and the relevant time.
NIS2 Directive
The European framework shall explain the origin of the duties and tasks of Member States, authorities and bodies.
Technical requirements and criteria for relevance
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Other official references1
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, Juni 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
Checking or preparing your own proof
State of change
A change in the legal situation is to be included in the audit order.
Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.
Work result The amendment note shows when and how it was reviewed.
Templates and worksheets
They want to collect their own data and capture a verifiable result.
Use calculated work aids to process classification, implementation, reporting deadlines and evidence.

