NIS2 · LEGAL SOURCES

NIS2 legal register

Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.

SCOPE
IMPLEMENTATION
EVIDENCE

Which legal area answers the question?

For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.

NIS2 · Standards Register

Appendix 1 BSIG · Sectors and types of equipment as defined in Appendix 1

Addressee Institutions in the activities covered

Compare the real service with the specific type of facility and its legal definition. Check size level and special rules for basically relevant activities.

Measures, evidence and sampling

6.1.4, 6.1.10 and 6.1.11NIS2-DEAN1-001

Accurately assign digital operating performance

Describe operation, ongoing administration, security and contractual responsibility. Only then assign the service to the appropriate facility type.

Testable evidence
Extract from performance agreement, organisation of operations and documented demarcation.
Sample
Compare hardware delivery, ongoing remote administration and managed security monitoring.

3, 4 and 5NIS2-DEAN1-002

The sector has been the subject of a number of technical definitions

Link permission, performance and technical law to each type of institution that is considered. A general industry name does not bear the assignment alone.

Testable evidence
Type of establishment with specific registration, supply or operating certificate.
Sample
Check the business activities of a diagnostic provider and a pure supplier in the same health environment.

Appendix 1 BSIGNIS2-ARB-037

Check drinking water supply and KRITIS threshold separately

Arrange operators, waterworks and power. Check separate volume acquisition as well as the requirements of a common plant. If you have different asset categories, determine the group first. Match the confirmed annual quantity with the appropriate line in the annex. Use the treated drinking water quantity for the waterworks and document the calculation path, release and time of status change. Determine the control systems, monitoring and actual supply functions dependent on the plant. Connect the status with protection, notification and official proof.

Testable evidence
The category of the device and the system status are two findings. The test and detection date has a proven basis.
Sample
Set the confirmed processed quantity to exactly 22.0 million cubic meters. The threshold is reached. Note why the billing amount in the waterworks case does not replace the threshold decision.

Supervision instructions and interpretation

BSI orientationNIS2-FAQ-01

Can the BSI's assessment of the substance make it compulsory to determine the classification?

The evaluation is based on the own answers and serves as a guide. The legal criteria and the actual activity remain decisive.

For your exam Secure the answers together with performance figures and figures. Let a disputed case be evaluated professionally.

Related provisions

Other official references2

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Acts and official implementing aids

First check for this task

Other official references1

Checking or preparing your own proof

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.

Templates and worksheets

They want to collect their own data and capture a verifiable result.

Use calculated work aids to process classification, implementation, reporting deadlines and evidence.