NIS2 legal register
Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.
IMPLEMENTATION
EVIDENCE
Which legal area answers the question?
For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.
NIS2 · Standards Register
§ 30 BSIG · Risk management measures
Addressee Particularly important and important institutions
For each relevant service, combine risks, ten fields of action, evidence and effectively verified effect. § 30 para. 3 gives priority to the technical requirements of the DVO for the providers covered there.
Measures, evidence and sampling
Paragraphs 1 and 2, point 1NIS2-DE30-001
Linking service-related risks and measures
Raise business risk from dependencies, threats and expected impacts. Determine target values, responsible and effective treatment for a selection of relevant risks.
- Testable evidence
- Released risk register with service, cause, impact, treatment decision and sample.
- Sample
- Track the failure of a shared identity service until the approved measure and effective proof.
Paragraph 2, point 2NIS2-DE30-002
Test incident management
Test the detection, escalation, situation assessment and controlled resumption of a synthetic event. Keep track of the time of knowledge according to the facts.
- Testable evidence
- Exercise protocol with timeline, roles, decisions and correction task.
- Sample
- Check whether the willingness to take a holiday is the right service and reporting role.
Paragraph 2, point 3NIS2-DE30-003
Technical verification of restart
Deletion time and data loss targets from the impact for affected services. Check recovery, data status and partition release using a controlled scenario.
- Testable evidence
- Proven re-start chain with measurement times, data integrity sample and release.
- Sample
- After technical restoration, have the department complete business process.
Paragraph 2, point 4NIS2-DE30-004
Monitor direct suppliers after service risk
Determine security requirements for direct providers, agree on triggering events and check the actual implementation after changes.
- Testable evidence
- Provider selection, contract finding point, service receipt and documented follow-up measure.
- Sample
- Compare the promised message of a fault with start time and input of the exercise report for an MSP.
Paragraph 2, point 5NIS2-DE30-005
Supporting safety over the system lifecycle
Arrange procurement, modification and maintenance to an approved safety scale. Perform vulnerability reports about evaluation, remedy and retest.
- Testable evidence
- System release with version status, change log and verified remedy.
- Sample
- Check whether replaced components have been released using the new version and a documented retest.
Paragraph 2, point 6NIS2-DE30-006
Check effectiveness instead of mere implementation
Choose a representative sample and an expected limit per measure. Set when a deviation escalates and how the correction is checked.
- Testable evidence
- Test plan, actual observation, findings and re-applied test scale.
- Sample
- intentionally enter incomplete evidence in the sample and check that the control remains open.
Paragraph 2, point 7NIS2-DE30-007
Aligning Cyber Hygiene and Training to Roles
Select tasks from typical everyday situations and measure in a sample whether employees are taking the agreed steps.
- Testable evidence
- The training plan, the attendance certificate, the task test and the follow-up date.
- Sample
- Try a fictitious request for help to see if the agreed reporting route is known and accessible.
Paragraph 2, point 8NIS2-DE30-008
Check cryptography and encryption in a comprehensible way
Link the internal default with actual data transmission or backup. Support configuration, responsible and handling of changes to keys.
- Testable evidence
- Approved standard, configuration certificate and renewal or recovery sample.
- Sample
- Select an internal service and check that its certificate change is controlled and its accessibility remains intact.
Paragraph 2, point 9NIS2-DE30-009
Review rights and assets in the rolling stock
Link function roles, release, rights assignment, inventory and withdrawal. Check connected identities and devices also with service providers.
- Testable evidence
- Current identity and inventory receipt with change date and release post.
- Sample
- Compare a completed exit with open technical accounts and returned devices.
Paragraph 2, point 10NIS2-DE30-010
Check multifactor authentication and crisis communication
Evaluate MFA or continuous authentication, as well as secure communication and emergency communication based on adequacy. Check the alternative channel in case of failure of control communication.
- Testable evidence
- Risk-related selection, configuration documentation and documented evasive communication test.
- Sample
- In an approved exercise, check the failure of the normal collaboration platform and the accessibility of critical roles.
Paragraphs 1, 3 and 4NIS2-DE30-011
Documenting the benchmark of proportionality
Connect risk exposure, size, costs, probability and severity including societal and economic impacts with the decision. Check priority and reach of EU requirements.
- Testable evidence
- Proportionality decision with alternatives, reasons and additional applicability.
- Sample
- In an MSP, show which specific attachment requirement the generic checklist determines more precisely.
Paragraphs 8 and 9NIS2-DE30-012
Understanding industry-specific security standards
Determine the relevant published determination, scope and version for the role. Arrange the actual measures and treat different specifications separately.
- Testable evidence
- Assignment of B3S, scope of system, requirement and actual evidence.
- Sample
- Select a relevant system limit that is not clearly contained in the standard or evidence used.
(2) first sentence, point 6NIS2-WIR-001
Clear the benchmark for an efficacy test in advance
Set performance, tested version, expected response, minimum circumference and measurement period before run. Match the scale with the relevant role.
- Testable evidence
- Released test plan with criterion identification and reference to the protection objective.
- Sample
- For an alarm exercise, follow the original scale until later running decision.
(2) first sentence, point 6NIS2-WIR-005
Check hit rate and longest reaction time separately
Calculate the number of all valid tests. Mark invalid or aborted samples and check the longest observed reaction time separately.
- Testable evidence
- Sample size, quota and time calculation with consistent baseline data.
- Sample
- Check three punctual takeovers from four valid attempts with a goal of four successful acquisitions.
Paras. 1 and paras. 2 sentence 1 no. 6NIS2-WIR-006
Evaluate the test run over all the criteria provided
Match the number and identifiers of the criteria with the signed test order. Separate deviation from incomplete proof and document the decision.
- Testable evidence
- Test run release with balanced target cases, negative samples and open criteria.
- Sample
- Remove the negative sample or record the same criterion twice. The run remains in need of clarification.
(2) first sentence, point 6NIS2-NAC-001
Link the original finding with criterion and change
Use the same detection identifier for target, observed first state, cause, remedy and confirmed new version.
- Testable evidence
- Initial test report, modification and dated assignment to the finding.
- Sample
- Select a change of the service checked and re-search the original scale and implementation proof.
(2) first sentence, point 6NIS2-NAC-005
Check the test roller and release when using the same test certificate
Keep track of the test and release role. Check the applicable requirement for independent testers separately in the DORA test program. Connect the calculation result to the final decision.
- Testable evidence
- Documented test role, evidence of independence, if any, and date release.
- Sample
- Leave the required independence certificate or release with the otherwise complete example and check the open status.
§ 30 BSIGNIS2-ARB-004
Mapping services and technical dependencies
Record a service ID, a responsible person, primary and replacement operation as well as the version status. From the necessary business process to application and identity to the supplier. Then adjust the reverse view and mark critical components without a documented assignment.
- Testable evidence
- Service-related inventory with traceable owner, update date and tested dependencies.
- Sample
- In a working copy, remove the identity service from the replacement operation branch. Check the deviation between service card and documented sample.
§ 30 BSIGNIS2-ARB-011
Prioritize risks to actual default
Describe fault, expected effects and existing measures per service. First check the most affected processes and prove which measure has already been tested. Follow unexplained basic assumptions and set a new assessment for changes.
- Testable evidence
- A prioritized and well-founded audit order per service with supporting documents and verifiable resubmission.
- Sample
- Change the internal assessment at the recovery time and compare the priority with unchanged professional effect. Watch which statement may actually change.
§ 30 BSIGNIS2-ARB-012
Establish a plan of measures with acceptance criteria
Arrange each measure to a service, a implementation role and a verifiable result. Draw the evidence for a concrete change and compare its scope with the test order. Perform deviations and still unconfirmed assumptions separately.
- Testable evidence
- A clear responsibility, verifiable objective, documented observation and follow-up date.
- Sample
- Change the acceptance criterion alone. The previous decision remains reconstructable under its original version, and the new standard is examined in its own version.
§ 30 BSIGNIS2-ARB-013
Recertification of Privileges
Match the numbered population of privileged rights with the released review. Treat missing purpose, unsigned release, expiration and technically remaining rights separately. Secure all withdrawals with a renewed view of actual effective rights.
- Testable evidence
- Tested denominator, comprehensible individual approvals and technically documented withdrawals before completion.
- Sample
- Leave one line double and check the visible data error. Then record the technically confirmed withdrawal with date and release.
§ 30 BSIGNIS2-ARB-014
Track roller changes until withdrawal
Take over the confirmed occasion from the personnel process with date and role. Arrange directory, application and, if applicable, service account to actual access. Check whether a representation or time limit is still required.
- Testable evidence
- A dated proof of withdrawal with case identification, a balanced application level and documented counter-probe.
- Sample
- Compare the time of withdrawal in the directory with the access in the application. Check the actual effect on the specified date.
§ 30 BSIGNIS2-ARB-015
Release changes with checked relapse option
Mark blocking test criteria and their supporting documents. Control setpoint values, new version, relapse sample and scheduled release window. After completion, measure the observed performance again and keep track of a detectable transfer position.
- Testable evidence
- An executable and verifiable change or relapse decision including a follow-up test.
- Sample
- Remove the proof for the modified version. Even a measured relapse time of twelve minutes will only be released when confirmed.
§ 30 BSIGNIS2-ARB-016
Match the setpoint configuration and observed operation
Use a permissible export of the operating team and the registered setpoint. Check a system from primary and one from replacement operation. Secure the deviation, exceptional period and the second comparison after the change.
- Testable evidence
- Versioned target-actual comparison with a temporary exception and comprehensible renewal.
- Sample
- Compare two error-free exports that represent different environments. The release requires a unique scope per data source.
§ 30 BSIGNIS2-ARB-017
Cryptographic dependencies and time limits
Capture used references, validity data, branched dependencies and a maintenance appointment. Test the change in a shared environment and test the technical acceptance in primary and replacement performance. Use only released proofs without secret key values.
- Testable evidence
- Service overview with agreed renewal, technical proof of change and next examination.
- Sample
- Put the process into the next scheduled maintenance. Check whether a confirmed change including dependent jobs before that is actually possible.
§ 30 BSIGNIS2-ARB-018
Test emergency communication without main channel
Define a synthetic message, confirmed personal functions and maximum time for adoption. Check the replacement channel with a shared exercise message. Determine accessibility, feedback and use of the correct contact list.
- Testable evidence
- Detached exercise with measured take-over, true recipients and secured follow-up.
- Sample
- Please send a message without a confirmed recipient ID. Check the defined treatment and check which information has actually been passed on.
§ 30 BSIGNIS2-ARB-019
Determine operational effects and restart order
Increase impact per performance, maximum tolerable interruption and restart target. Check the time reference of all dependencies required for the minimum function. Match the priority with the responsible ones and prove if a destination from the recovery path is not technically attainable.
- Testable evidence
- A justified priority and a verifiable time path for the resumption of the services concerned.
- Sample
- Halve the professional transfer time in the workbook. Check whether the shorter duration is available as a planning hypothesis or as actual measured proof.
§ 30 BSIGNIS2-ARB-020
Check backup and recovered data
Select a data level in the shared test area, determine the sum required and perform a specific sample. Compare date reference, total number and selected unique records with the confirmed reference. Capture the acceptance and follow-up observations.
- Testable evidence
- Balanced recovery with evidence of data level, scope and actual professional use.
- Sample
- Compare the decrease with the target population per reference date for correct total number. After correction, check the same selection and the affected population again.
§ 30 BSIGNIS2-ARB-021
Test replacement operation and return to regular supply
Do the same mandatory performance in the exercise by replacement and then by the prescribed rule path. Secure the processed process identifiers and check whether processes are duplicated or lost on return.
- Testable evidence
- Released replacement and proven return with consistent data.
- Sample
- Increase the number of orders in the sample. Acceptance continues to require a complete, one-time order per identifier.
§ 30 BSIGNIS2-ARB-022
Technical restoration technically decrease
Perform the target path with the necessary dependent services in the exercise. Secure time measurement, data level, successful processing and confirmed release. Perform remaining partial performances as open results.
- Testable evidence
- Complete sample with differentiated technical and technical time.
- Sample
- Repeat the process only in the browser without the dependent confirmation step. Check how the decision in the workbook changes despite fast-measured response time.
§ 30 BSIGNIS2-ARB-023
Check direct suppliers at the required performance
Combine three selection features with concrete test data. For the performance concerned, request the current scope of a proof, the measured response path and documented treatment of deviations. Reason for exceptions and their maturity.
- Testable evidence
- Reasoned supplier selection with performance, order-specific supporting documents and open conditions before release.
- Sample
- Replace the report with a formal certificate with different scope. Check which statement to the specific service must be supported in addition.
§ 30 BSIGNIS2-ARB-024
Practically prepare change of service provider
Track an example data set from export to technical full take-over to professional use by the replacement provider. Capture time, average and maximum processing, coverage of test data and confirmed return or deletion conditions.
- Testable evidence
- Checkable swapping plan with measured transition, reliable data acceptance and confirmed technical acceptance.
- Sample
- Insert the new assignment only for known standard cases. Check at least one agreed special category and prove the correction.
§ 30 BSIGNIS2-ARB-025
Use supplier incident information
Take the first notice with time, the claimed scope and open facts. Then check technical observation, own service effect and the responsible reporting method. Follow the contractual transfers and your own knowledge of the significant incident separately.
- Testable evidence
- Event file with source, impact, own assessment and verified state of the facts transmitted.
- Sample
- Change only the time of the supplier notification. Check whether the relevant own time of knowledge from the confirmed facts is still comprehensible.
§ 30 BSIGNIS2-ARB-029
Determine the coverage of evidence per service and obligation
Arrange each expected position of the actual source. Check time period, timeliness, appropriate scope and clearance. Determine processing steps and dates from the specific deficit. The evaluation only writes the same position once even for several references.
- Testable evidence
- Evaluable test cover with transparent denominator and concrete work order for each deviation.
- Sample
- Capture a double position identifier and check to prevent double credit. Restore the position and confirm a new matching proof.
§ 30 BSIGNIS2-ARB-030
Set the scope of the test risk-based
Consider which processes, dependencies and changes are included. Document the number of expected criteria and the reasons for limited samples. Arrange the approved examination of a qualified and, if necessary, independent role.
- Testable evidence
- Released test order with tested object, selection justification, number of samples and planned evidence.
- Sample
- Replace the run in the new state with a formally successful old sample. The measure is not recognised for the modified version without appropriate test reference.
§ 30 BSIGNIS2-ARB-051
Check cybersanitary roll-related and measure coverage
Determine the role of an observable action from your own business. Capture target persons and justified exceptions with deadline. Evaluate participation based on the confirmed list and action based on a fictitious process. Secure the observed reaction and professional classification per group. Name roles where participation or safe decision is missing. Set re-up, repetition and release. In addition, check the management training according to your own mission.
- Testable evidence
- The management receives a comprehensible coverage per responsibility group and a concrete mandate for roles that do not yet make the observed decision in a certain way.
- Sample
- Complete a participation, but leave the relevant decision open in case of testing. Update only the participation rate.
§ 30 BSIGNIS2-ARB-055
Uncovering common dependencies of direct suppliers
Determine operators, platform, identity, storage and support as relevant to the performance of the alternate. Confirm the information by contract attachments, service proof or a suitable check. In a controlled scenario, check the promised alternative and the specialized function. Increase time, data reconciliation and application in the same sample. Document the observed dependence and consistency for the protection measure. Set an independent alternative or a controlled follow-up order if there is any risk remaining.
- Testable evidence
- The supplier decision contains a documented dependency picture and an observed evasive performance. Separate responsibilities and remaining risks are visible before release.
- Sample
- Just change the administrative release in a confirmed independent way. In addition, check whether the operation and return of data actually work independently.
§ 30 BSIGNIS2-ARB-056
Target subcontractors to evaluate changes
In the notification, you should specify the date, the modified part of the service and still unresolved data. If you wish to use the intended contract procedure, please request the necessary information from the direct service provider. Check the dependencies, proofs and contact details concerned. Define a technical criterion for service and escalation at the new stand. Confirm the status with proof and appointment. If you have an open effect, you will place a specific order and secure the risk until the confirmed decision is taken.
- Testable evidence
- The decision to amend the Directive is linked to the performance concerned, the observed test effect and, where appropriate, a specific reservation.
- Sample
- Complete a confirmed contact with the new caller. Repeat the entire handover with reception and responsibility.
§ 30 BSIGNIS2-ARB-057
Cloud Responsibility per control step
Name tasks such as account withdrawal, operation monitoring, configuration and restoration for the service used. Check reach, time period and access information of the provider receipt. For shared controls, select an approved own sample on the specific client. Determine where the provider receipt is and what position your own verification is required for. Close the gap with a responsible job and recheck.
- Testable evidence
- For each control step selected, operators, competent authority, allowable evidence and remaining gap are determined.
- Sample
- Attach a general report to the provider's access control. Use the scope to determine which specific client test it replaces or supplements.
§ 30 BSIGNIS2-ARB-059
Verify that temporary compensating controls are effective and have an expiry date
Name the original test scale and the risk portion to cover the interim measure. Set its permissible duration and decision maker. Perform the approved sample with controlled target case and countercase. Determine which operating situations and times are covered. Place the order for the final solution. Secure repeat sample, ongoing monitoring and reassessment before expiry.
- Testable evidence
- An open finding has a responsible interim decision, a sample and a specified follow-up date. The operation can see when the intermediate decision needs to be reassessed.
- Sample
- Complete a confirmed night representation. Test the same target and counter-case additionally at night before the cover is extended.
Supervision instructions and interpretation
Editorial guidanceNIS2-FAQ-WIR1
When does a measured response time give a statement about efficacy?
Pre-determine what must be observed per valid experiment. The time for three successful reactions shows only part of the effect if the plan requires four successful reactions. Also, secure negative samples and discontinued experiments.
For your exam Calculate the three successful acquisitions from four valid trials and compare time and quantity criteria separately.
Editorial guidanceNIS2-FAQ-NAC1
How can a follow-up test in the DORA program be proven from the same technical sample?
Check the scope of the common raw material, comparability and requirements of the applicable test program. Determine the independence required by the DORA programme and the own validation of the result.
For your exam Compare the original criteria and documented follow-up. Complete program-specific release.
Related provisions
Other official references3
- Technical requirements and criteria for relevance (opens in new tab)
Implementing Regulation (EU) 2024/2690 · EUR-Lex
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, June 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
- Execute risk-based resilience testing programme (opens in new tab)
Art. 24 DORA
The test planning translates criticality, risks and changes into tests with comprehensible coverage and remedy.
Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.
Acts and official implementing aids
First check for this task
BSI Act as amended
Check the German obligation for the actual activity performed, the legal entity and the relevant time.
NIS2 Directive
The European framework shall explain the origin of the duties and tasks of Member States, authorities and bodies.
Technical requirements and criteria for relevance
The articles and the annex specify requirements for the specifically mentioned types of suppliers.
Other official references1
- Technical implementation assistance to the implementing regulation (opens in new tab)
ENISA · Technical Implementation Guidance, Juni 2025
Use examples of evidence and assignments for testing. The benchmark for the binding requirement remains the relevant legal act.
Checking or preparing your own proof
State of change
A change in the legal situation is to be included in the audit order.
Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.
Work result The amendment note shows when and how it was reviewed.
Templates and worksheets
They want to collect their own data and capture a verifiable result.
Use calculated work aids to process classification, implementation, reporting deadlines and evidence.

