Shared IT for energy and water

Check and separate distributed systems for their actual function for electricity grids and drinking water supply.

SCOPE
IMPLEMENTATION
EVIDENCE

View shared systems per critical performance

Arrange the systems of the energy supply network necessary for safe operation to the EnWG and the valid safety catalogue. Check for an additional operated critical water system § 28 para. 5 sentence 2 and 3 BSIG, the protection of their functionally relevant IT and the relevant proof obligation.

In case of a common technical error, the same recording can support both areas. Confirm for the water system which components are required for their actual functioning. The acceptance and the substantiality decision follow each performance on its own scale.

From the test order to the secured result

  1. The two operating services and their IT delimit

    Support network activity and confirmed water system. Arrange common platform, measurement data, operating facilities and professional processes according to their actual function.

    Work result Two performance limitations and a documented assignment of the shared components.

  2. Assign protection requirements and test criteria

    Link catalogue status and energy requirements to the grid sample. Set criteria for the water system to resume, share data and the functional area.

    Work result Sample plan with own criteria and common time and raw data reference.

  3. Evaluate effects separately and report them if relevant

    Check § 5d para. 3 EnWG and § 32 BSIG including required installation information. Vote for the transmission route and assignment with the current procedure description and secure the decision per legal basis.

    Work result Evidenced event history with two impact assessments and comprehensible transmission.

  4. Technical resumption and follow-up test

    From the same raw data, confirm the grid scale and additionally the verified water service. If there is no water sample, request a new observation and transfer the result to the detection application.

    Work result Reasoned releases per performance and an open finding for each continuing lack of effect.

Findings on this work path

The shared platform will be assessed for each critical performance based on its actual contribution.
The shared platform will be assessed for each critical performance based on its actual contribution.

The shared platform will be assessed for each critical performance based on its actual contribution.

One platform malfunction, two operating clearances

Situation Arrange the systems of the energy supply network necessary for safe operation to the EnWG and the current safety catalogue.

Situation

HanseWerk Versorgung GmbH operates an energy distribution network and, in the case of practice, a drinking water system that has already been confirmed as critical. Both use a common platform for data exchange during operation. Under N12-E01, the grid area documents knowledge of the significant incident at 16.11.2026, 06:30 UTC. The water system confirms its own significant impairment at 16.11.2026, 09:00 UTC.

Monitoring and evaluation

The network area can prove its operational function again. In the water sector, the technical examination of completeness and recoverable time of the measurement data is missing. The raw chronology is available to both. The approval for the water service remains open until the confirmed sample.

Reasoned decision

The workbook sets up two separate time series for EnWG and BSIG. The system reference for water liability is carried out in an appropriate form. The department stores the way and with which reference the respective mandatory contents were transmitted.

EnWG

Basic limits 17.11.2026, 06:30 UTC and 19.11.2026, 06:30 UTC. Follow-up from 17.11.2026, 07:00 UTC is the monthly reference.

BSIG

Basic limits 17.11.2026, 09:00 UTC and 19.11.2026, 09:00 UTC. Follow-up from 18.11.2026, 13:00 UTC is the monthly reference.

Negative test

In the counter-test, proceed from a platform that does not make any necessary contribution to the operation of the water system. Reason for the remaining effects on this plant and adjust test and reporting decisions based on proven facts.

Work result

A certificate or open finding released per farm performance, with proven scope, reporting status and its own technical impact.

Working aids for your own operation

Document legal decisions per institution and performance. Check each proof whether the scope, status, access and statement support the assigned obligation.

  • Obligation and detection matrix

    Document legal decisions per institution and performance. Check each proof whether the scope, status, access and statement support the assigned obligation.

    Outcome Reasoned obligations and comprehensible decisions on the use of common evidence.

    Read the instructions

    Fictional example N10 · Bank and ICT service providers use the same technical protocol. A bank position remains open until their own business sample. Case N12 shows the separate assignment of common systems.

    1. Legal decision per obligation Capture confirmed entities, activity, exact reference, decision, role and deadline.
    2. Check the proof under the same identifier Link position and document form. Confirm evidenced depth of information and actual retrievability.
    3. Release your own evaluation Keep in mind who has released the use and what proof is missing.
  • Registration deadlines for DORA, NIS2 and specialist law

    Calculate the basic periods of time for the same event from the respective knowledge, classification and transmission times. Run DORA and national paths in separate sheets.

    Outcome Time and receipt chains per legal entity and reporting obligation. Each reporting stage has its own time reference.

    Read the instructions

    Fictional example N11 · The dispatch of the DORA initial report sets the 72-hour reference for the intermediate report. In the TK and MSP thread, knowledge of the significant incident determines the 72 hours. N12 adds EnWG and critical water system.

    1. Confirm Concern and Classification Link the same event identifier to service, jurisdiction, knowledge and each path of confirmed classification.
    2. Check shipping times and steps Capture actual shipping times. Use the last relevant intermediate message or the national No. 2 message matching the path.
    3. Confirm calendar and transmission Check work calendar, exception and progress reference if necessary. Link the decision to the relevant reporting channel.
  • Findings, post-test and completion

    After a change, check whether the original criterion is met to a comparable extent. Track counter-test, release and date.

    Outcome Reasoned financial status per finding and visible deviation from the agreed date.

    Read the instructions

    Fictional example N09 · The correction is documented. Only the comparable sample with counter-test and release is completed. Another criteria version and a stand without release are entered as counter-tests.

    1. Connect findings and first test Secure criteria, initial findings, proof and correction under the same identifier.
    2. Evaluate comparable sample Confirm result, counter-test, role and, if necessary, demonstrate required independence.
    3. Document release and appointment Collect date and release receipt. Use the valuation reference date for a comprehensible date.

Legal basis and official information

First check for this task

Other official references6

The two operations are individually verified

Energy

Start with a concrete network or plant-related performance. Describe who is responsible for safe operation, which systems are required and who can actually carry out changes.

The tested performance belongs to a grid, an energy system or digital control.

Assign operator role, safe operation management, catalog and reporting point for the specific energy service

Your decision Which protection and reporting path applies to the operator role? Determine the assignment for each performance actually affected.

Critical installations

The scope of the installation or the official time of proof shall be clarified.

Check the installation limit, transition level, reporting route and established detection date.

Work result A documented system delimitation with separate detection and reporting order.