CRA · LEGAL SOURCES

CRA article register

Find articles and annexes with links to official wording and checks for your product.

PRODUCT
CONFORMITY
MAINTENANCE

From CRA article to verifiable proof

The register opens up all 71 articles and eight annexes. Start with the article number, a keyword or a legal area. You will find concrete test orders, counter-samples, case examples and linked work equipment on practical topics.

Use the test matrix for a systematic examination of Annex I. For market reference, publication or continuation, open the linked official find site in the version relevant to your date of reference.

Requirements and test points

CRA · Article Register

Art. 16 · Prove transmission via the central platform

Addressee Reporting team and product responsibility

Secure platform access, routing information, newsstand and actual transmission receipt.

Measures, evidence and sampling

Paragraph 1CRA-A16-001

Tracking the transmission document by reporting mode

Call off the shipping receipt of the exercise and the information on the scheduled routing. Compare it with your own notification file.

Testable evidence
Protocol with operation, date and actual text sent.
Sample
Enter an internal release as a sent message and check the missing platform receipt.

Platform and transmission documentCRA-A16-002

Confirm charges and subsequent update

Open separate transmission documents for each roll. Secure deviations and check the following steps of the respective rules.

Testable evidence
Three independent traces with a comprehensible common event number.
Sample
Do not accept the confirmed DORA classification and keep track of the incident. The bank has an open placement order and no calculated first mark for a case considered serious. The confirmed CRA and BSIG reporting channels and their time-receipts remain valid.

Paragraph 1CRA-A16-003

Linking both transmissions in a comprehensible way

Secure the voluntary notice and the subsequent transmission separately. Include user protection and subsequent reporting levels.

Testable evidence
Dated transmission protocol and concrete follow-up.
Sample
Take the proof of a significant effect on the product function from the second observation. Evaluate the mandatory trigger again based on the remaining confirmed facts and name the next test step.

Supervision instructions and interpretation

Editorial guidanceCRA-FAQ-006

What is the closing date?

In case of serious product incidents, use the actual incident report. For actively exploited vulnerabilities, use the availability of correction or risk mitigation measures.

For your exam In the example, remove the actual incident report and leave an available measure.

Editorial guidanceCRA-FAQ-012

Is a single levy sufficient for several affected organisations?

A common chronology can support several decisions. Each responsible organization checks its own trigger, time anchor and its competent transmission in the sample.

For your exam In the exercise, remove the bank classification. Check the impact on each of the three reporting decisions.

Related provisions

Other official references6

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Official sources

First check for this task

Other official references27