CRA · CASE STUDY

One incident, three reporting decisions

Three organisations use the same raw material.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

On May 10, 2028, a failed warning function of a networked device disrupts two regulated customers. The manufacturer knows about 09:20 UTC a confirmed serious safety incident with an impact on the safety of its product. The German water operator gains knowledge of his own significant security incident around 10:30 UTC.

A bank recognises its ICT-related incident around 10:10 UTC and considers it serious about 13:00 UTC based on its own criteria. The three documented decisions are case assumptions. They are executed by the relevant authorities.

Compare test data and consequences

  • Manufacturer

    Scale
    CRA knowledge on May 10 at 09:20
    Observation
    Serious product incident confirmed
    Follow
    Early warning no later than 11 May 09:20 UTC
  • Water operators

    Scale
    BSIG knowledge about 10:30
    Observation
    Own relevance evidenced
    Follow
    Early first notification no later than 11 May 10:30 UTC
  • Bank

    Scale
    Knowledge 10:10, classification 13:00
    Observation
    Four hours after classification are first reached
    Follow
    First notification no later than 10 May 17:00 UTC

An observation with three time-limit anchors

The manufacturer plans 11 May 09:20, the waterworks 11 May 10:30 and the bank 10 May 17:00 UTC. The basis are different time covers.
The manufacturer plans 11 May 09:20, the waterworks 11 May 10:30 and the bank 10 May 17:00 UTC. The basis are different time covers.

Calculate each organization with your own knowledge or confirmed classification. Actual transmissions need each organisation separately.

Edit the test step by step

  1. Provide Versioned Common Observations

    Mark the measured value, version, source and time. Distinguishingly distinguish secure and still to be confirmed information.

    Testable evidence A comprehensible basis for supporting documents with a separate assignment per organisation.

  2. Leading early decisions with their own clock

    Arrange manufacturer knowledge, operator knowledge and the separate DORA times. Calculate the case-related first maximum marks.

    Testable evidence Own timesheet per role with trigger, receiver and responsible delivery.

  3. Confirm charges and subsequent update

    Open separate transmission documents for each roll. Secure deviations and check the following steps of the respective rules.

    Testable evidence Three independent traces with a comprehensible common event number.

Worked decision and negative test

Decision in case

In the case of practice, each organisation sets its own first maximum mark. The obligation to report quickly is already in force. The 72-hour mark for a DORA intermediate message refers to the actual first notification, while the first 72-hour marks in the CRA and BSIG examples link to their own knowledge.

The bank ensures its own classification and delivery to the competent authority. Linked original documents and comprehensible references are sufficient for the joint file. Three reports transmitted are confirmed separately.

Counter-sample and impact

Do not accept the confirmed DORA classification and keep track of the incident. The bank has an open placement order and no calculated first mark for a case considered serious. The confirmed CRA and BSIG reporting channels and their time-receipts remain valid.

Templates and worksheets

  • Document initial messages per organisation

    Calculate the first registration marks for three confirmed decision-making paths and secure their charges.

    Outcome Separate reporting files per legal entity with time, competent authority, receipt and reference to common chronology.

    Read the instructions

    Fictional example Manufacturers, water operators and banks know different triggers. The bank classifys its incident at 13:00 clock.

    1. Identify the starting situation The information provided shall be recorded on the same time basis and, where appropriate, on the same classification.
    2. Run the test Matching your own competent transmission and calculated plan mark.
    3. Secure decision and evidence Secure receipts and follow-up tasks for each reporting track.

Official sources

First check for this task

Other official references3

What depends on your result?

  • Co-ordinate notifications from manufacturers and operators

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Assigning evidence between DORA and NIS2

    Two regulated organisations want to use the same records and demonstrate their respective responsibilities.

    View the guide
  • Separate reporting tracks

    Complete the notification decision of an affected AI provider and continue to check with its criteria and recipients.

    View the guide