CRA · CASE STUDY

New information after a voluntary report

Review an earlier notice as soon as knowledge and impact change.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

In the case of networked cooling monitors, the manufacturer detects a near-prone incident in the morning. The replacement warning prevents the impairment in the first case. After documented initial evaluation there are still no sufficient facts for a mandatory notification by the manufacturer.

14:20 UTC confirms product responsibility for the version concerned with a serious incident affecting the safety of an essential product function. The first voluntary information and new evidence of effect can be found in the same chronology.

Compare test data and consequences

  • First signal

    Scale
    Replacement warning prevents impairment
    Observation
    Almost an incident assessed
    Follow
    Voluntary track possible
  • New knowledge

    Scale
    Serious product effect demonstrated
    Observation
    Confirmation at 14:20 UTC
    Follow
    Lead your own mandatory lane
  • Transmission

    Scale
    Separate supporting documents and a clear reference
    Observation
    A joint process with two decisions
    Follow
    Check supporting documents per charge

When the new status changes the notification decision

In the morning, a voluntary almost-prevention is available. At 14:20 clock, the manufacturer's own mandatory track is confirmed.
In the morning, a voluntary almost-prevention is available. At 14:20 clock, the manufacturer's own mandatory track is confirmed.

Keep the voluntary transmission. Determine the mandatory notification from the new confirmed event.

Edit the test step by step

  1. Identifying the first facts and role

    Describe the missing product effect and the existing replacement function. Check a voluntary way with clear justification.

    Testable evidence A dated initial decision with open test point for new effects.

  2. The new observation refers to the mandatory trigger

    Keep confirmed effect, knowledge to 14:20 UTC and the responsible manufacturer. Arrange Art. 14 to the actual reporting branch.

    Testable evidence Checkable information with own reporting track.

  3. Linking both transmissions in a comprehensible way

    Secure the voluntary notice and the subsequent transmission separately. Include user protection and subsequent reporting levels.

    Testable evidence Dated transmission protocol and concrete follow-up.

Worked decision and negative test

Decision in case

The information in the morning is voluntarily classified and transmitted in the sample. A mandatory trigger is confirmed around 14:20 UTC. From this time reference, the manufacturer checks immediate transmission, the applicable maximum period and subsequent stages.

The decision remains rewritten if the evidenced effects change. Already conducted evaluations and submitted versions remain comprehensible in the file.

Counter-sample and impact

Take the proof of a significant effect on the product function from the second observation. Evaluate the mandatory trigger again based on the remaining confirmed facts and name the next test step.

Templates and worksheets

  • Documenting information and new knowledge

    Arrange near-prone, later confirmed effect and own transmission documents to time.

    Outcome Renewable file with voluntary notice, confirmed mandatory reference and associated transmissions.

    Read the instructions

    Fictional example According to a voluntary notice, 14:20 UTC has its own mandatory trigger.

    1. Identify the starting situation Document the initial information and product reference.
    2. Run the test Match new knowledge and correct reporting track.
    3. Secure decision and evidence Prove transmission and follow-up to the right track.

Official sources

What depends on your result?

  • Coordinating voluntary advice and reassessment

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Reporting route and deadlines

    If the mandatory track is established, document the appropriate reporting levels and their respective final reference.

    Check the reporting route and deadlines