CRA · IMPLEMENTATION GUIDE

Assess substantial modifications

Evaluate changed purpose, requirements and test procedures for a product version already delivered.

PRODUCT
CONFORMITY
MAINTENANCE

What you decide and prove

Start with the status for which conformity has already been checked. Determine its released functions, risks, limits and references from technical documentation. Also, check which function is actually added to the receiver after the update.

For a post-market modification, consider both alternatives from Article 3, point 30. An impact on conformity with Part I of Annex I or a change to the intended purpose may give rise to a substantial change. A version number or the scope of the change package does not answer this question alone.

If you make a significant change, you will once again determine the product category, the evaluation procedure to be applied and the requirements affected by the change. You will keep in mind which existing documents are transferable and where a new assessment is needed. In addition, consider role and transitional rule if another entity changes or an earlier market position is affected.

From the tested end to the new function

The old state shows measured values and warns. The new state should control the temperature itself.
The old state shows measured values and warns. The new state should control the temperature itself.

Compare both purpose provisions and mark each document that needs to be checked for the target level again.

Edit the test step by step

  1. Deriving the starting and target purpose from the product portfolio

    Compare instructions for use, technical description and release-relevant functional sample for both stands.

    Testable evidence Dated purpose pair with version and location.

  2. Evaluate change and requirement

    Check the purpose and effect of Annex I, Part I separately. Arrange transferable documents to the unchanged properties.

    Testable evidence Essential change decision and coverage of four of the six case criteria.

  3. Re-determine the scope of release

    Confirm category and evaluation procedures. Complete the missing test evidence before re-release of the amended version.

    Testable evidence Release decision with two concrete follow-up tests and appropriate documentation.

A pure display should trigger a position commands in the future

A fictitious manufacturer has released a power sensor as a pure display device from March 2028. It determines the temperature, displays it and sends a warning message. The requested new version is to adjust the room climate itself in the future.

A preliminary test compares six agreed properties. Four findings are transferable for the unchanged measurement and display. Two documents for secure limitation and separate access rights are missing for the new control function. The manufacturer has confirmed in writing the change of purpose.

What you'll find out in the case

A reasoned change decision with test route, coverage limits and comprehensible lock or release.

Editing the Practice Case

Templates and worksheets

  • Product change and new release

    Compare original purpose, new effect, requirements and documented release of the amended version.

    Outcome Reasoned decision on the amendment with open tests per product level.

    Read the instructions

    Fictional example After a change in purpose, four out of six documents are transferable. Two documents and the new release are missing.

    1. Identify the starting situation Record the old and the target with purpose and source.
    2. Run the test The test shall be carried out in accordance with the following procedures:
    3. Secure decision and evidence Confirm approval including new test route and remedy.

Official sources

What depends on your result?

  • Conformity, declaration and release

    You must coordinate the re-evaluated delivery level with explanation and technical documentation.

    View the guide
  • Re-route necessary remote processing

    The modified location is a necessary remote function. Check its actual effect in the supply chain.

    View the guide