CRA · CASE STUDY

From display to remote control

Compare old display and new automatic control.

PRODUCT
CONFORMITY
MAINTENANCE

Starting position and test order

A fictitious manufacturer has released a power sensor as a pure display device from March 2028. It determines the temperature, displays it and sends a warning message. The requested new version is to adjust the room climate itself in the future.

A preliminary test compares six agreed properties. Four findings are transferable for the unchanged measurement and display. Two documents for secure limitation and separate access rights are missing for the new control function. The manufacturer has confirmed in writing the change of purpose.

Compare test data and consequences

  • Purpose

    Scale
    Measure, display and warn
    Observation
    New version controls itself
    Follow
    New purpose confirmed
  • Test cover

    Scale
    6 agreed properties
    Observation
    4 detected
    Follow
    2 Catch up to documents
  • Release level

    Scale
    Assessment for the amended version
    Observation
    Only the old state confirmed
    Follow
    New release locked

From the tested end to the new function

The old state shows measured values and warns. The new state should control the temperature itself.
The old state shows measured values and warns. The new state should control the temperature itself.

Compare both purpose provisions and mark each document that needs to be checked for the target level again.

Edit the test step by step

  1. Deriving the starting and target purpose from the product portfolio

    Compare instructions for use, technical description and release-relevant functional sample for both stands.

    Testable evidence Dated purpose pair with version and location.

  2. Evaluate change and requirement

    Check the purpose and effect of Annex I, Part I separately. Arrange transferable documents to the unchanged properties.

    Testable evidence Essential change decision and coverage of four of the six case criteria.

  3. Re-determine the scope of release

    Confirm category and evaluation procedures. Complete the missing test evidence before re-release of the amended version.

    Testable evidence Release decision with two concrete follow-up tests and appropriate documentation.

Worked decision and negative test

Decision in case

The transition from observation to active regulation changes the intended purpose in the case. Treat the conversion as a substantial change and evaluate the new version. The four transferable documents retain their documented purpose reference.

Set suitable acceptance criteria for the two open properties and determine the procedure to be used. The old approval note does not cover the new regulation until this evaluation.

Counter-sample and impact

Replace the control with a smaller display adjustment. The confirmed purpose remains the same. If the test also shows no effect on compliance with Annex I Part I, the change in this variant is not essential. Secure the justified check in the amendment protocol.

Templates and worksheets

  • Product change and new release

    Compare original purpose, new effect, requirements and documented release of the amended version.

    Outcome Reasoned decision on the amendment with open tests per product level.

    Read the instructions

    Fictional example After a change in purpose, four out of six documents are transferable. Two documents and the new release are missing.

    1. Identify the starting situation Record the old and the target with purpose and source.
    2. Run the test The test shall be carried out in accordance with the following procedures:
    3. Secure decision and evidence Confirm approval including new test route and remedy.

Official sources

What depends on your result?

  • Evaluate significant product change

    Transfer the same test criteria to your own product and save the different starting data.

    View the guide
  • Conformity, declaration and release

    You must coordinate the re-evaluated delivery level with explanation and technical documentation.

    View the guide
  • Re-route necessary remote processing

    The modified location is a necessary remote function. Check its actual effect in the supply chain.

    View the guide