CRA · CASE STUDY

A bid falls two years short on support

Compare the promised support with the required operating time.

PROCUREMENT
MAINTENANCE
EVIDENCE

Starting position and test order

A fictitious public procurement agency plans to operate networked technology monitors for seven years from 2028. The pre-documented criteria require a confirmed supply during this time, a reachable security contact point and the reconstructable assignment of an updated component for the version offered.

The offer confirms the conformity documents for the version offered. Contact point and component sample are successfully confirmed in the sample. The manufacturer documents five years of support. A reliable contractual commitment for the last two planned years is missing. The purchasing team keeps the criterion open in its evaluation.

Compare test data and consequences

  • Operation and maintenance

    Scale
    7 years confirmed
    Observation
    5 years
    Follow
    2 years remain open
  • Safety contact and component reference

    Scale
    Both samples can be traced
    Observation
    2 out of 2 occupied
    Follow
    Secure existing partial proofs
  • Assessment per version

    Scale
    Originals and commitment to the tender
    Observation
    Product proofs are available, care commitment remains open
    Follow
    The criteria are not considered to be fulfilled

Two years of care stay open

Of the seven years of operation planned, five are covered by the care allowance.
Of the seven years of operation planned, five are covered by the care allowance.

Secure the duration, version and promised performance before the awarding legal assessment.

Edit the test step by step

  1. Determine requirements and conditions of proof before evaluation

    Link the use, required duration, product acquisition and required safety evidence with the documented assessment basis.

    Testable evidence Reasoned criteria and verifiable scale per offer.

  2. Practically compare explanation, care and contact

    Arrange the documented delivery stand. Check contact response and an example proof of a well-kept component. Compare the confirmed period with the deployment plan.

    Testable evidence Comparison matrix with observed results and concretely open care time.

  3. Document deviation and operator sequence

    Keep track of your own assessment status and the clarification permitted by the award rules. Arrange additional operational evidence required for the responsible role.

    Testable evidence Dated decision with gap, location and further processing.

Worked decision and negative test

Decision in case

The product documents and the two sample samples are positively documented. Two years of care are missing for the own evaluation criterion. The contracting authority clarifies according to the relevant procedural rules whether and how the gap can be answered

A five-year commitment alone does not decide on the CRA conformity or award. The responsible body evaluates confirmed deployment, individually relevant support obligation and own requirements based on the evidence.

Counter-sample and impact

Complete an indeterminate statement "Support can be extended in principle" from a sales presentation. Check the liability, version and concrete duration. Without corresponding proof, the comparison level remains at five years.

Templates and worksheets

  • Award criteria, manufacturer maintenance and operating time

    Compare the required operating time and practical manufacturer's proofs with the specific offer.

    Outcome Comparable procurement documents with gaps in evidence and actual product status.

    Read the instructions

    Fictional example Seven years of operation are required, and care is confirmed for five years.

    1. Identify the starting situation Recognise needs, wording and criteria from the procurement basis
    2. Run the test Compare support commitment, product documentation and observable care.
    3. Secure decision and evidence ensure deviation and allow for clarification in the procurement file.

Official sources

First check for this task

Other official references1

What depends on your result?

  • Procuring with product proof

    Transfer the same test criteria to your own product and save the different starting data.

    Checking evidence of procurement
  • Check direct suppliers at the required performance

    Arrange the confirmed product data for a recorded institution of your own supplier and risk assessment.

    Work through the case
  • Check the supplier before ordering

    For a DORA-relevant ICT service, you will also determine the financial function, the service provider and the appropriate contract documents.

    View the guide
  • Support period and security updates

    Check the actual manufacturer's justification of the support period and the accessibility of updates.

    Check support and updates