NIS2 · LEGAL SOURCES

NIS2 legal register

Find provisions in Germany’s BSIG, the NIS2 Directive and sector-specific rules, with checks for each task.

SCOPE
IMPLEMENTATION
EVIDENCE

Which legal area answers the question?

For German institutions, the BSIG is in the foreground with plants and sectoral rules. The directive assigns national obligations, rights and the European framework. The implementing regulation concreteises the work scale for explicitly mentioned digital providers.

NIS2 · Standards Register

§ 31 BSIG · Additional requirements for critical installations

Addressee Operator of critical installations

Limit the systems that are relevant to the functioning of the affected installation. Check additional risk-appropriate precautions and the effectiveness of attack detection.

Measures, evidence and sampling

Paragraph 1NIS2-DE31-001

Adjust protection for critical installations

Determine the systems, components and processes that are relevant to the plant's functioning. Evaluate additional measures based on the consequences of a failure of this plant.

Testable evidence
Installation limit, associated services and justified additional measures
Sample
Select a shared IT service and use the failure chain to show if it is relevant for the installation.

Paragraph 2NIS2-DE31-002

Prove effective attack detection

Arrange suitable systems for the detection of attacks to the critical scope of equipment. Check data collection and actual processing by the competent authority.

Testable evidence
Cover overview, free training signal and processing documentation.
Sample
Check with a harmless approved test signal whether the alarm provided reaches the responsible on-call.

Paragraphs 1 and 2NIS2-WAS-004

Reference the retest to the functional water performance

Check the protection certificate offered for the systems and processes that are actually relevant. Link the acceptance with your own observation of water performance.

Testable evidence
Expertly tested sample with data level and complete functional monitoring for the plant.
Sample
Leave a missing data confirmation open in the common restart and close only after a documented re-check.

Supervision instructions and interpretation

Editorial guidanceNIS2-FAQ-11

Are CRITIS thresholds, cybersecurity evidence and physical resilience connected?

They may concern the same institution. Assignment rule, application start and verification order result from the relevant provision and its transitional arrangements.

For your exam Track the system assignment via threshold, registered plant type and the specific time of detection.

Editorial guidanceNIS2-FAQ-WAS1

How to treat a shared platform for grid and water?

Check the actual role of the platform for the functioning of the critical water system and the safe operation of the energy network. For the affected water operation, the own requirements and impact of the incident must be demonstrated.

For your exam Arrange a raw document for both functions and check which own acceptance per function is missing.

Related provisions

Other official references3

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Acts and official implementing aids

First check for this task

Other official references1

Checking or preparing your own proof

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.

Templates and worksheets

They want to collect their own data and capture a verifiable result.

Use calculated work aids to process classification, implementation, reporting deadlines and evidence.