§ 32 BSIG · Reporting of significant incidents

Addressee Affected institutions in the German reporting system

The early first report and the incident report are linked to the knowledge of the significant incident. The monthly reference follows the actual reported incident report. In case of a continuous incident, the reporting level changes.

Measures, evidence and sampling

Paragraph 1 sentence 1 points 1 and 2NIS2-DE32-001

Jointly demonstrate the time and deadlines

Determine when the institution had sufficient facts to know a significant incident. Early first and incident reports are immediately made within the respective limits of 24 and 72 hours.

Testable evidence
Time recording with facts, channel, report text and input documents per level.
Sample
Check a situation that you have been able to recognise on the weekend with later classification and compare time of knowledge, shipping and reception.

Para. 1 sentence 1 No. 3 and 4NIS2-DE32-002

Distinguishing between intermediate and monthly reporting

Prepare an interim report upon request. Determine the monthly reference from the actual incident report submitted in accordance with No. 2 and determine the final cause classification.

Testable evidence
The dispatch history with regard to the incident report, intermediate status and final version.
Sample
Calculate a case with incident report on 31 December. January and document the calendar check.

Paragraph 2NIS2-DE32-003

Plan progress report in case of an incident

Evaluate whether the incident is still ongoing at the regular closing date. Note progress report and required final report after final processing.

Testable evidence
Progress report with baseline, current status and scheduling until the end.
Sample
Simulate resumption before technical reasons are clarified and decide on the basis of the documented state of processing.

Paragraph 3NIS2-DE32-004

Complement the effects on critical installations

In case of actual or potential effects, name the type of critical installation, the critical service provided and its concrete impairment.

Testable evidence
Appendix reference, performance description and impact log in the message.
Sample
Check whether an installation report makes its effect on supply and recovery understandable.

Paragraphs 1(1) and 2NIS2-MEL-002

Calculate the different 72-hour receipts correctly

Write down the actual relevant knowledge and transmission of the DORA first message per path. Calculate the national 72 hours from the knowledge of the significant incident, the DORA interim period from the initial shipment.

Testable evidence
Time limits with their own time source, competence and reference for each transmission.
Sample
Move the DORA first shipment alone. Check that the DORA interim period changes and that the national time limits follow from their respective knowledge.

§ 32 BSIGNIS2-ARB-028

Deriving progress report and final notification

Lead to each level of content, time of dispatch, recipient and receipt. Check on the relevant date whether the incident persists and which information is already confirmed. Document remedy, still existing effects and the confirmed cause according to the actual state of knowledge.

Testable evidence
Complete and reconstructable reporting status from first dispatch to the documented final report.
Sample
Change only the dispatch of the early first message. The national monthly reference continues to follow the no. 2 message. Then check the influence of a postponed processing end.

§ 32 BSIGNIS2-ARB-044

Prepare additional information for a critical installation concerned

Link the identification code from the system directory to the critical service. Name which effect is available, which is conceivable and which observation it confirms. Include quantities, time and supplied areas only with confirmed reference size. Note open questions with time of the next update. Take the current reporting path out of the current official regulations for your own institution. Check responsibility and receipt of each transmitted version.

Testable evidence
The affected plant, critical service and observed or possible effect are recorded in the correct stages. The follow-up makes changes in range and duration visible.
Sample
Please note that only a separate training system was affected. Check the plant effect separately and document the confirmed decoupling.

Supervision instructions and interpretation

BSI reportingNIS2-FAQ-03

Do CRITIS operators have to report in both portals?

The BSI identifies the MIP as priority for operators of critical plants and federal authorities on a transitional basis and does not require additional identical reporting in the BSI portal. Check the current path before use.

For your exam In the crisis plan, test the path per role and document the same case identification in the message and internal protocol.

Editorial guidanceNIS2-FAQ-TEL1

Which notification determines the monthly period in the TKG procedure?

The legal reference to the transmission according to § 168 para. 1 sentence 1 no. 2 TKG is decisive. In case of ongoing processing, § 168 para. 2. Use the currently published technical procedure of the Federal Network Agency for the transmission.

For your exam Compare first report, follow-up report and date calculated from No. 2.

Editorial guidanceNIS2-FAQ-MEL1

When does the 72-hour deadline start in the various reporting channels?

At DORA, the actual first notification is the starting point of the interim period. In the BSIG and TKG path considered, knowledge of the significant incident counts for the 72-hour limit. The complete reporting and exception rules remain decisive per path.

For your exam Enter a later DORA first transmission and check the time reference of the other paths.

Editorial guidanceNIS2-FAQ-MEL2

How does a later classification of DORA affect you?

If the classification is made as a serious more than 24 hours after knowledge of the ICT-related incident, Art. 5 para. 2 RTS sets up four hours from the classification for the initial notification. Archive the relevant information and classification documents.

For your exam Compare the ratings in the alarm clock precisely to and just after the 24-hour limit.

Related provisions

Other official references3

Editorial update 2026-11-28 · Fassung und Zuständigkeit für den eigenen Stichtag prüfen.

Acts and official implementing aids

First check for this task

Other official references1

Checking or preparing your own proof

State of change

A change in the legal situation is to be included in the audit order.

Trace the amendment, the date it applies and the affected workflow as of the same cut-off date.

Work result The amendment note shows when and how it was reviewed.

Templates and worksheets

They want to collect their own data and capture a verifiable result.

Use calculated work aids to process classification, implementation, reporting deadlines and evidence.